Protection Relay Settings
36
Single-Phase TRIP Support
The myPV ClearSky PLUS’s SEL-751 is pre-programmed to support both 3-Phase and
1-Phase TRIP support functionality.
I-Phase TRIP support may be used by commissioning staff validate proper inverter anti-
islanding behaviors, as required by IEEE 1547.
Any single-phase {A, B, or C} may be toggled OPEN/TRIP or CLOSED via pushbutton
or SCADA operation by following the procedures described in the section Operational
Testing.
Protection Settings File Loading
Solar-Ops, at the time of device integration and testing, will load either a template RDB
file, or a Customer-Modified RDB file with interconnection specific settings. Contact your
Account Manager to specify which option you prefer.
Содержание ClearSky Plus
Страница 16: ...Resources 16 West Terminations Side LV Cabinet West Terminations Side LV Cabinet Terminal Blocks 2 AWG Cu ...
Страница 21: ...Resources 21 ...
Страница 22: ...Resources 22 ...
Страница 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Страница 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Страница 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Страница 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Страница 56: ...Network Integration 56 ...
Страница 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Страница 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Страница 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Страница 102: ...Spare Parts 102 ...
Страница 103: ...Spare Parts 103 ...