Resources
20
Line Amperage (3-Phase System): 694.487A / 3 = 231.496A
Now that we know are maximum expected current flow is 232A, we can choose an
appropriate CT ratio.
For metering, we may choose a 300:5. The 232A falls into the mid-range of the 300A
rating, however we could also safely choose a 200:5 so long as the CT has an
appropriate “rating factor” which will typically allow a CT to operate at 1.5 or 2.0 of its
nameplate while still maintaining proper accuracy. To make this determination, the CTs
rating curves should be consulted to ensure the CT rating is appropriate for your
application.
For relaying however, we may choose a higher ratio CT, possibly a 400:5. This higher
ratio will provide better measurements of fault current conditions that are typically much
larger than the system’s normal operating conditions. A 400:5 CT with a rating factor of
2.0 will provide measurements of up to 800A before saturating.
Regardless of what PT or CT ratio is ultimately selected, the meter and protection relay
devices are configured to understand what instruments are connected via the PTR
(Potential Transformer Ratio, 60: 1 = 60) and CTR (Current Transformer Ratio, 300:5 =
60) settings variables.
The selection of instrument transformers is specific to the application, the
interconnection and facility electrical characteristics, and also an Engineer’s preference.
For the myPV ClearSky™ PLUS, we have assembled the following table of standard
part numbers for PTs and CTs to use, unless otherwise specified buy the Customer:
The Interconnection Voltage: 12.47 kV * 1000 = 12,470V L-L
The Line Voltage: 12,470V L-L / sqrt(3) = 7,199.558V L-N
Facility Wattage: (5,000kW * 1000) = 5,000,000W
Facility Total Amperage: 5,000,000W / 7,199.558V L-N = 694.487A
The Math (Expected Current Flow for a 12.47kV Interconnected, 5,000kW Facility):
Содержание ClearSky Plus
Страница 16: ...Resources 16 West Terminations Side LV Cabinet West Terminations Side LV Cabinet Terminal Blocks 2 AWG Cu ...
Страница 21: ...Resources 21 ...
Страница 22: ...Resources 22 ...
Страница 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Страница 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Страница 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Страница 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Страница 56: ...Network Integration 56 ...
Страница 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Страница 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Страница 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Страница 102: ...Spare Parts 102 ...
Страница 103: ...Spare Parts 103 ...