Mode Descriptions:
1. Automatic Mode
All Protection logic and reclosing (if configured) is enabled and all programmed
commands for TRIP and CLOSE are allowed
By pushbutton or SCADA, the Protection Relay can 3-Phase TRIP
By pushbutton or SCADA, the Protection Relay can 3-Phase CLOSE with
Automated Inrush Mitigation Switching
The Protection Relay cannot be commanded (via pushbutton or SCADA) to 1-
Phase TRIP or 1-Phase CLOSE
2. Repair Service Mode
All Protection logic and reclosing (if configured) is enabled, however CLOSE
commands are DISABLED … TRIP commands are ALLOWED
By pushbutton or SCADA, the Protection Relay can 3-Phase TRIP
Only by pushbutton, the Protection Relay cannot 3-Phase CLOSE
Only by pushbutton, the Protection Relay can 3-Phase CLOSE with Automated
Inrush Mitigation Switching
By pushbutton or SCADA, the Protection Relay can 1-Phase TRIP
Only by pushbutton, the Protection Relay can 1-Phase CLOSE
Power Supply & UPS Battery TRIP
The myPV ClearSky PLUS’s SEL-751 is pre-programmed to support TRIP on-alarm-
condition for the following conditions and time delays:
On loss-of-control-power, when the N.O. power supply digital output OPENs, the
Protection Relay will TRIP after 30 seconds.
On UPS-battery-alarm, when the N.O. UPS digital output OPENs, the Protection Relay
will TRIP after 40 minutes.
Both time delays may be adjusted to support longer or shorter durations by modifying
the RDB template settings file.
Содержание ClearSky Plus
Страница 16: ...Resources 16 West Terminations Side LV Cabinet West Terminations Side LV Cabinet Terminal Blocks 2 AWG Cu ...
Страница 21: ...Resources 21 ...
Страница 22: ...Resources 22 ...
Страница 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Страница 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Страница 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Страница 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Страница 56: ...Network Integration 56 ...
Страница 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Страница 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Страница 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Страница 102: ...Spare Parts 102 ...
Страница 103: ...Spare Parts 103 ...