Operational Testing
92
Commercial Operation
Following testing, take the following steps, once you are ready to place the myPV
ClearSky™ into normal commercial operation.
Commercial Operation Settings:
1. Rotate the Mode Selector Switch to AUTOMATIC (if any phase was OPEN the will
cause a 3-phase TRIP)
2. Press and hold the TARGET RESET button until …
3. … the TRIP Red indicator is no longer illuminated
4. Firmly press the CLOSE button … the MV Breakers should CLOSE
5. The CLOSE button’s BREAKER CLOSED Red indicator should now be illuminated
6. The three (3) individual A-PHASE, B-PHASE, and C-PHASE Red indicators should
now also be illuminated
The myPV ClearSky™ may be left in this condition indefinitely.
Numbered Illustration of Mode Selection Switch & Protective Relay Indicators
Содержание ClearSky Plus
Страница 16: ...Resources 16 West Terminations Side LV Cabinet West Terminations Side LV Cabinet Terminal Blocks 2 AWG Cu ...
Страница 21: ...Resources 21 ...
Страница 22: ...Resources 22 ...
Страница 28: ...Design Considerations 28 myPV ClearSky PLUS 25kV Termination Cabinet Door Swing ...
Страница 38: ...Receiving 38 Equipment is Wrapped Palletized Typically Equipment Delivery ...
Страница 45: ...Receiving 45 Top Fuse Mounting Hardware Three 3 MV Fuses Fully Assembled Installed ...
Страница 52: ...Electrical Terminations 52 LV Termination Cabinet ...
Страница 56: ...Network Integration 56 ...
Страница 64: ...Pre Energization Checks 64 View of Center Switching Cabinet Through Wire Glass Window ...
Страница 67: ...Pre Energization Checks 67 View of Three 3 PT Fuses Through Wire Glass Window ...
Страница 93: ...Operational Testing 93 Numbered Illustration of Protective Relay Indicators ...
Страница 102: ...Spare Parts 102 ...
Страница 103: ...Spare Parts 103 ...