4
- 4
4
PROCEDURE FOR STARTING UP A REDUNDANT
SYSTEM
(2) Procedure for starting up in debug mode
The standard procedure for starting up either system in the debug mode is shown
below.
Explanation of program and parameter creation is not provided here.
Mounting Modules
...Refer to
Mount the power supply module, CPU module, network module, and I/O module to the main base
unit/extension base unit.
Wiring
...Refer to
(1) Connect the power cable to the power supply module.
(2) Connect the battery connector to the CPU module battery connector.
(3) When connecting the extension base unit, connect the main base unit and the extension base
unit by an extension cable.
(4) Connect the network wiring to the network module.
*1
(5) Connect the I/O module.
Module Initial Settings
...Refer to
(1) Set the RUN/STOP switch of the CPU module to the STOP position.
(2) Set the RESET/L.CLR switch of the CPU module to the reset switch neutral position.
(3) Make switch settings for the MELSECNET/H module.
Checking that Power Supply of Main Base Unit and Extension Base Unit is ON
...Refer to
(1) Check the following items and turn ON power supplies of the power supply modules of the
main base units and extension base units .
· Wiring of power supply
· Power supply voltage
· RUN/STOP switch position of the CPU module: STOP
· RESET/L.CLR. switch position of the CPU module: Reset switch neutral
(2) Check that "POWER" LEDs of the power supply modules of the main base unit and the
extension base unit are turned ON (green).
Connecting to the PC in which GX Developer is installed
...Refer to
(1) Start up GX Developer in the GX Developer installed PC.
(2) Connect the PC in which GX Developer is installed to the CPU module.
Writing Parameters and Programs to CPU
...Refer to
Write the parameters and programs created with GX Developer to the CPU module.
Start