2.
Clean the groove in the chamber cap using a small brush or lint-free tis-
sue and isopropyl alcohol.
Figure 5-3. Cleaning the Chamber Cap
3.
Allow the chamber cap to dry thoroughly.
4.
Grease the O-ring using Dow Corning vacuum grease (or equivalent).
5.
Replace the O-ring, being careful not to nick or scratch it.
Checking the Cell and Expansion Chambers for Leaks
To check the cell and expansion chambers for leaks perform the following
procedure.
This procedure should be performed in a temperature-stable environ-
ment after the pycnometer has been warmed up for at least two hours.
Before performing this procedure, check the chamber cap to ensure that
it is not the source of leaks. It should be free from particles, the O-ring
should be properly seated, and it should not contain excessive grease.
1.
Allow the pycnometer to equilibrate thermally in a room having a stable
temperature.
2.
Press
to enter manual mode.
1
Maintenance
AccuPyc 1330
5-16
September 1996
Содержание AccuPyc 1330
Страница 1: ...AccuPyc 1330 Pycnometer Operator s Manual V3 03 Part No 133 42808 01 January 2005 ...
Страница 6: ...CHAPTER 1 GENERAL INFORMATION Organization of the Manual Conventions Equipment Description ...
Страница 61: ...CHAPTER 5 TROUBLESHOOTING AND MAINTENANCE Troubleshooting Error and Status Messages Maintenance ...
Страница 83: ...CHAPTER 6 ORDERING INFORMATION ...
Страница 86: ...APPENDIX A CHANGING THE ANALYSIS MODULE ...
Страница 92: ...APPENDIX B ANALYSIS THEORY ...
Страница 96: ...APPENDIX C CALIBRATION THEORY ...
Страница 99: ...APPENDIX D FORMAT OF TRANSMITTED DATA ...
Страница 108: ...APPENDIX E PRINTER CHARACTER SET ...
Страница 111: ...INDEX ...