
Sheeter SVC 525C
85
Transport, interim storage
Interim storage of the machine
6.4
Interim storage of the machine
6.4.1
Outdoors
Here's how to store the machine temporarily outdoors.
Prerequisites
These prerequisites must be fulfilled:
• Machine is bolted to the transport pallet.
• The packaging must be intact.
• Storage time outdoors = maximum two weeks.
Interim storage of
the machine
Here's how to store the machine outdoors:
Protect machine with a roof or suitable tarpaulin against humidity.
As soon as condensate forms, store the machine in a storage room
(danger of corrosion).
Loosen plastic foil from the transport pallet and lift it so that the air can
circulate.
Machine is stored temporarily.
6.4.2
In a storage room
For storage conditions, see chapter “3.2.8 Ambient conditions”
WARNING!
Incorrect storage.
Non-observance could result in severe property damage.
Observe the specified storage conditions.
Содержание SVC 525C
Страница 1: ...Sheeter Translation of the original operating manual Keep for future reference SVC525C ...
Страница 48: ...44 Sheeter SVC 525C Product description Technical data ...
Страница 66: ...62 Sheeter SVC 525C Structure and function Protective devices ...
Страница 90: ...86 Sheeter SVC 525C Transport interim storage Interim storage of the machine ...