
Sheeter SVC 525C
163
Decommissioning, storage
Introduction
10
Decommissioning, storage
10.1
Introduction
10.1.1
Qualification of personnel
This table lists the necessary qualification of the personnel related to "De-
commissioning and storage" of the machine.
10.1.2
Safety instructions
10.2
Decommissioning
10.2.1
Temporary shutdown
Here's how to shut the machine down temporarily.
Prerequisites
These prerequisites must be fulfilled:
• Main switch is switched off.
• Compressed air supply is cut off.
Sp
ecia
lly tr
ained
pers
onne
l
Ins
tr
u
ct
ed ope
rat
ing
pers
onne
l
Ins
tr
u
ct
ed pe
rson
nel
with sp
ecia
lized tr
aining
(mec
han
ic
a
l/ ele
c
tr
ic
al
engine
ering)
Decommissioning
-
-
X
Storage
X
-
-
Putting the machine
back into operation
-
-
X
Table 31: Qualification of personnel; Decommissioning, storage
Key: X permitted, - not permitted
CAUTION!
Incorrect storage.
Non-observance could result in property damage.
Observe the corresponding storage conditions.
Содержание SVC 525C
Страница 1: ...Sheeter Translation of the original operating manual Keep for future reference SVC525C ...
Страница 48: ...44 Sheeter SVC 525C Product description Technical data ...
Страница 66: ...62 Sheeter SVC 525C Structure and function Protective devices ...
Страница 90: ...86 Sheeter SVC 525C Transport interim storage Interim storage of the machine ...