
Sheeter SVC 525C
83
Transport, interim storage
Packaging of the machine
6.2
Packaging of the machine
6.2.1
Machine
The machine is delivered as follows:
• On a transport pallet (Europe)
• In a shipping crate (overseas).
In addition, it is covered with plastic foil that is fastened to the transport pal-
let.
6.2.2
Accessories/options
Standard accessories, tools, options, and documentation are packaged
with the machine or accommodated in separate cartons or containers.
Procedure:
Be sure to unpack these carefully.
6.2.3
Incoming inspection
Procedure:
When you receive the shipment, check the packaging right away for
transport damage.
Check the machine and accessories for transport damage.
Check that the shipment is complete based on the delivery note.
6.2.4
In case of damage
Procedure:
Notify the transport company immediately of any damage.
Contact your transport insurance carrier immediately.
Safeguard the machine and accessories from further damage.
Содержание SVC 525C
Страница 1: ...Sheeter Translation of the original operating manual Keep for future reference SVC525C ...
Страница 48: ...44 Sheeter SVC 525C Product description Technical data ...
Страница 66: ...62 Sheeter SVC 525C Structure and function Protective devices ...
Страница 90: ...86 Sheeter SVC 525C Transport interim storage Interim storage of the machine ...