30
GTXI User's Guide
Figure 2-4: GT7700B Rear View
Installing the GT7700
The GT7700 comes with all the boards purchased for that system
pre-installed (unless specified otherwise).
1. Mount the GT7700 unit by either:
♦
placing it on a regular work surface or
♦
Mounting it in a standard 19-inch (24-inch deep)
equipment rack using the optional GT7700R Rack Mount
Kit.
2. Set the line voltage to 110V or 220V as needed by the line
voltage switch on the rear of the GT7700. See Figure 2-2 and
Figure 2-4.
VGA
GBIP
Serial
Parallel
USB Ethernet
Line Voltage
Switch
110/220
AC Line
Receptacle
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Содержание Geotest GT7700
Страница 113: ...98 GTXI User s Guide Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Страница 139: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Страница 145: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Страница 191: ...176 GTXI User s Guide Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Страница 209: ...Chapter 3 Index 194 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...