Chapter 2 - Installing and Operating
27
Chapter 2 - Installing and Operating
Unpacking and inspecting the GTXI
1. Before unpacking the GTXI, check the outside of the shipping
package for damage. Note any damage on the shipping bill.
2. Remove the platform from the shipping carton.
Note
:
Save the original shipping carton and packing material
in case the GTXI unit needs to be returned to Geotest.
3. Read the packing list to ensure all listed items are enclosed,
including hardware, power cords, manuals, etc.
4. Inspect the unit. If any missing items, defects, or damage are
noticed, notify Geotest immediately.
Setting up the GTXI
The GTXI unit is shipped as a stand-alone system or as a bus
extender system. If instrumentation boards are ordered, they will be
installed on GTXI carrier boards and put inside the platform. For
installation details, refer to the appropriate section:
"
"Installing the GT7700"
"
"Installing the GT7710"
"
"Installing the GTXI-700 for Bus Extender Mode"
This chapter describes how to set up the GTXI platform. Additional
steps are required to install boards inside the GTXI. These are
described in
Chapter 3, “Installing PC Instrument Boards”
and
Chapter 4, “Assigning Resources.”
.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Содержание Geotest GT7700
Страница 113: ...98 GTXI User s Guide Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Страница 139: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Страница 145: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Страница 191: ...176 GTXI User s Guide Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Страница 209: ...Chapter 3 Index 194 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...