![Manitowoc J-1300 Скачать руководство пользователя страница 65](http://html1.mh-extra.com/html/manitowoc/j-1300/j-1300_service-manual_700968065.webp)
Section 6
Electrical System
6-14
Harvest Sequence
5. WATER PURGE
The water pump continues to run as the
water dump valve energizes for 45
seconds to purge the water from the water
trough.
The hot gas valve(s) and HPR solenoid
valve open at the beginning of the water
purge. Hot refrigerant gas is diverted into
the evaporator throughout the 45-second
water purge.
After the 45-second water purge, the
water pump and dump valve de-energize.
New style control boards have an
adjustable water purge. This permits a 0
(off), 15, 30 or 45 second water purge.
(Old Style Control Board Shown)
Remote Models
5. Water Purge
(45 Seconds)
Toggle Switch
ICE
Bin Switch
Closed
Control Board Relays
#1
Closed
Water Pump
ON
#2
Closed
Hot Gas Solenoid
ON
Harvest Pressure Regulating (HPR) Solenoid
ON
#3
Closed
Water Dump Valve
ON
#4
Closed
Contactor Coil
ON
Liquid Line Solenoid
Energized
Compressor
ON
Condenser Fan Motor
ON
Safety Controls
(Which could stop ice machine operation)
High Pressure Cut-Out
Closed
Main Fuse (On Control Board)
Closed
Transformer Fuse (On Control Board)
Closed
Thermistor Operation
OK
SV1556
(74)
L1
TB35
SEE SERIAL PLATE FOR VOLTAGE
L2 (N)
TB32
(55)
HIGH
PRESSURE
CUT-OUT
HPR
SOLENOID
(79)
(78)
(61)
(60)
(71)
(76)
(80)
HOT GAS
SOLENOID
DUMP
SOLENOID
TB30
TB30
TB30
TB30
(75)
(98)
(99)
WATER
PUMP
TB31
TB37
(57)
(58)
(59)
(82)
(83)
LIQUID LINE
SOLENOID
CONTACTOR
COIL
(56)
(73)
(81)
TRANS.
FUSE
FUSE (7A)
3
1
2
4
ICE THICKNESS PROBE
DISCHARGE LINE THERMISTOR
1D
1A
1C
1B
LOW D.C.
VOLTAGE
PLUG
(62)
(63)
(65)
(64)
(66)
BIN SWITCH
(66)
(67)
(62)
(69)
(68)
ICE
OFF
CLEAN
HARVEST LIGHT/
SAFETY LIMIT CODE LIGHT
BIN SWITCH LIGHT
TOGGLE SWITCH
←
←
←
←
INTERNAL
WORKING VIEW
66
62
67
68
69
VIEW FOR WIRING
(49)
(47)
(46)
(45)
(50)
TB30
TB30
TB35
(48)
(42)
(51)
(52)
L1
TB33
TB34
(53)
(F1)
(F2)
CONTACTOR
CONTACTS
TERMINATES AT
PIN CONNECTION
COMPRESSOR
RUN CAPACITOR
R
R
PTCR
REMOTE FAN
MOTOR
RUN CAPACITOR
REMOTE
CONDENSER
*OVERLOAD
R
S
C
Содержание J-1300
Страница 1: ...J Model Service Manual 1997 Manitowoc Ice Inc Part No 83 5631 9 Rev A 8 97 Ice Machines ...
Страница 10: ...Warranty Section 1 1 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 14: ...Section 2 Installation References 2 4 deflector is compatible with Manitowoc ice machines ...
Страница 29: ...Section 2 Installation References 2 18 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 45: ...Section 3 Maintenance 3 16 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 105: ...Section 6 Electrical System 6 54 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 148: ...Section 7 Refrigeration System 7 43 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 164: ......