36
- Operate the levers corresponding to the booms unfolding (the booms should be positioned
in the vertical - levers A and D).
-
With the hands, pull the boom end backwards, to relieve the tension on the steel cable.
-
Install the cable on the spring (detail 3). Then, install the safety cable on the spring
support (detail 4).
ASSEMBLING THE BOOMS
3
4
Electric control
BOOMS
Make sure the assembly is correct.
2
4
3
1