65
MAINTENANCE
STEEL CABLES DIAGRAM
SIL
VER CABLE
(internal pulley)
ORANGE CABLE
(external pulley)
SIL
VER CABLE
ORANGE CABLE
PROCEDURES
- With
the
booms
unfolded,
first
install
the
steel
cable
of
the
first
boom
section.
- Next, install the silver steel cable on the
second boom section (pulley 1).
-
Then, install
the orange
steel cable
on the
external
pull
ey
, also
on the second
boom
section (pulley 1).
- Lock the cables on the pulley 2.
1st boom section
2nd boom section
boom end
pulley 1
pulley 2