30
2.7 Starting the System
1. Make sure the power switch on the power supply is in ON position.
2. Press the power button -
Tower
- press the button on the front.
Rack chassis
- press the Power button on the left of the front panel of your NAS
server. Press the button for longer than 1 second.
3. Wait for the server to boot up. The boot up process takes approximately 5 minutes.
2.8 Shutting Down the System
1. Shut down the system pressing the power button once. The whole shutdown process
might take seconds or minutes until data can all be safely distributed to disk drives.
2. To shut down the server from the management page you can find the button on the
upper right of the NASFinder screen.
3. To configure automatic power-on and shutdown, you can select System > Maintenance
> Reboot/Shutdown on a management console. You can set daily or day in month
schedules. See page 64 for more information.
Содержание nastorage 12600 series
Страница 1: ...1 NAStorage 4600 12600 12620 Series Tower 1U 2U Rack mount User Manual Rev 1 1 ...
Страница 16: ...16 6 Use the bezel key to lock the drive tray Repeat the above process to install more disk drives Bezel Lock ...
Страница 24: ...24 3 Attach the inner rails to the sides of the chassis 4 Gradually slide the chassis into rack ...
Страница 50: ...50 4 Click to open the Trusted Root Certification Authorities tab Click the Import button ...
Страница 59: ...59 5 Save the compiled module to a position as shown below ...
Страница 158: ...158 ...