18
2
INSTALLATION PROCEDURE
302.035
DIMENSION F - Bar-pusher furthest feeding point value entry
To carry out this operation, it is necessary to have the bar-pusher and collet
assembly installed in the bar feeder. See the “Operation and maintenance
manual”, paragraph “Guides, half bushes, bar-pusher and collet - Replace-
ment”.
Move the front end of the bar-pusher against collet (point
F
)
press:
and detect the value displayed.
Legend:
1
-
“All the way back” bar-pusher position
2
-
Bar-pusher position at bush-holder device inlet
(opening of half bushes)
3
-
Bar-pusher position at nose outlet (lubrication stop).
4
-
“All the way forwards” bar-pusher position
5
-
Facing flag
6
-
Spindle
7
-
“All the way back” headstock position
8
-
“All the way forwards” headstock position
9
-
“All the way back” sleeve position
10
-
“All the way forwards” sleeve position
11
- “All the way back” bar-pusher position after the ex-
traction movement.
1
5
2
3
6
7
8
4
7
8
10
6
35.002 Ec.0
9
11
4
4
4
Fixed headstock lathe
CNC type-sliding headstock lathe
Cam sliding headstock lathe
Moving sleeve lathe
Содержание BOSS 542 CNC
Страница 102: ...100 9 302 034 ...
Страница 107: ...2 302 035 ...
Страница 165: ...60 3 OPERATION INFORMATION 302 035 ...
Страница 167: ...62 302 035 3 ...