75
6
USE AND OPERATION
302.034
6.5. FEEDER SET-UP AND AUTOMATIC CYCLE START
The following list is a sequence of feeder set-up and automatic cy-
cle start operations required if the feeder has to be started up for
the first time.
•
Carry out feeder set-up according to the bar to be machined
(paragraph 5.3.)
•
Prepare the bars to be machined (paragraph 6.4.).
•
Feed bars to the magazine (paragraph 6.5.1).
•
Adjust lube oil flow (paragraph 6.5.2).
•
Start the automatic cycle (paragraph 6.5.3).
6.5.1 Bar magazine - Filling
CAUTION: do not manually lift loads with weights exceeding those prescribed by the
applicable regulations in force; ask for another worker’s help if necessary.
CAUTION: wear personal protections prescribed by the applicable regulations in
force.
Follow these instructions to load bars:
•
open the upper guard;
•
place bars against the plate
A
and close the upper guard.
34.033 Ec. 0
34.105 Ec. 0
A
Содержание BOSS 542 CNC
Страница 102: ...100 9 302 034 ...
Страница 107: ...2 302 035 ...
Страница 165: ...60 3 OPERATION INFORMATION 302 035 ...
Страница 167: ...62 302 035 3 ...