SAN256N Director 2045-N16
44
..
SAN256N director system errors
TCM display error codes and TFIO/TSW error codes are listed and defined in , Data
collection and troubleshooting.
If an error code indicates that a module failed the Power Up Diagnostic Tests, then do
the following:
1. Unscrew and unlatch the failed module card ejectors and slide the module out of the
chassis slot.
2. Install the replacement module by sliding it into the chassis slot until the rear
connectors are firmly seated into the midplane connectors. Secure the module into
position by latching the card ejectors and tightening the screw to the chassis frame.
3. Run the power up diagnostics again to confirm that the modules are operating
properly. Repeat step through step as needed.
4. The keys for the front and rear panel doors are kept by IBM Field Service personnel,
or by IBM certified Third Party Field Service Organization personnel, at all times.
5. Close and lock the rear panel door (if applicable) and remove the key from the panel
door lock. The front panel door may remain unlocked and open at this time.
Performing an AC power redundancy check
Before bringing the SAN256N director online, you must ensure the AC power
redundancy is configured correctly. Use the following procedure to perform an AC power
redundancy check
Note: The SAN256N director must be powered on and in its present operating state, as
well as the Power supply assembly switches must be On and AC present on both
inputs for this test.
1. Set the customer’s circuit breaker that supplies AC power to Line A to Off. All LEDs
should remain lit, except for the power supply LEDs associated with that power input.
2. Set the customer’s circuit breaker that supplies AC power to Line A to On; then set
the customer’s circuit breaker that supplies AC power to Line B to Off. All LEDs
should remain lit, except for the power supply LEDs associated with that power input.
3. Set the customer’s circuit breaker that supplies AC power to Line B to On.
Installing the Enterprise Manager workstation PC and external modem
If you have not unpacked all shipping boxes, unpack all shipping boxes associated with
the Enterprise Manager workstation PC, which contains the monitor, keyboard, mouse,
desktop/tower PC, interconnecting cables, and manufacturer’s installation/operation
manuals, if not previously done. IBM recommends that the manufacturer’s installation/
operation manuals supplied with the PC be used as the reference source in setting up
and configuring the workstation.
Attention: Refer to safety notices before starting an installation.
Содержание TotalStorage SAN256N Director 2045-N16
Страница 2: ......
Страница 3: ...IBM TotalStorage SAN256N Director 2045 N16 Installation and Maintenance Guide GC26 7714 00...
Страница 10: ...SAN256N Director 2045 N16 viii...
Страница 12: ...SAN256N Director 2045 N16 x...
Страница 18: ...SAN256N Director 2045 N16 xvi...
Страница 26: ...SAN256N Director 2045 N16 6...
Страница 84: ...SAN256N Director 2045 N16 64...
Страница 94: ...SAN256N Director 2045 N16 74...
Страница 97: ...Chapter 5 Hardware maintenance procedures 77 Figure 33 SAN256N director front chassis FRU locations 1 2...
Страница 120: ...SAN256N Director 2045 N16 100...
Страница 142: ...SAN256N Director 2045 N16 122...
Страница 144: ...SAN256N Director 2045 N16 124...
Страница 156: ......
Страница 157: ...Printed in USA GC26 7714 00...