SAN256N Director 2045-N16
40
customer’s supplied cabinet(s) to certify that the cabinet(s) meets all airflow and
mechanical requirements/specifications prior to installation. This IBM review and
approval of a non-IBM-supplied cabinet is required to ensure compliance to airflow
specifications and mechanical specifications for proper installation and operation of the
SAN256N director.
Installing a SANC40 cabinet
Use this procedure to install the factory-shipped SANC40 cabinet.
Important: When the SANC40 cabinet is shipped in conditions of extreme (high/low)
temperature and/or humidity, allow 24 hours for environmental stabilization of the
SAN256N chassis and/or cabinet at room temperature. This 24-hour environmental
stabilization period must be accomplished in the room/area where the installation will
take place. The ESD bag/shipping materials must be removed to allow proper
environmental stability prior to the installation of the SANC40 cabinet.
1. Verify that the SANC40 cabinet is in the correct position in relation to the floor tile
cutouts (see Figure 24.).
2. Fully extend all levelers to place the SANC40 cabinet at a level position, and then
slightly lift the cabinet off its wheels to prevent cabinet movement.
3. If necessary, loosen and adjust the 3/4-inch nut on the leveling feet with a 3/8-inch
thick adjustable foot wrench.
4. If locked, unlock and open the cabinet front panel door by pulling the door latches,
located on the right center edge of the panel doors, outward and upward CW to open
the panel door. Retain the door latch key(s) for future use.
5. Verify that all attaching hardware is installed and tight and the chassis is securely
mounted to the cabinet.
6. Verify that the SANC40 cabinet power supply assembly switches are set on the 0
(Off) position.
7. Connect an ESD wrist strap plug into the ESD connector on the chassis, located on
the center front of the chassis, and place the ESD strap around your wrist. Fasten the
strap using the Velcro strap fastener.
8. Verify that each TFIO blade is seated properly in the chassis and tightly connected to
the appropriate Midplane connectors.
9. Verify that each TSW module is seated properly in the chassis and tightly connected
to the appropriate Midplane connectors.
Attention: Refer to safety notices before starting the installation.
DANGER:
To prevent the SANC40 cabinet from tipping over, the leveler
feet must be fully extended.
R001
Attention: Use a properly attached ESD wrist strap when handling any
TFIOs, TSWs, TCMs, or power supply assemblies; otherwise damage to
equipment may occur.
Содержание TotalStorage SAN256N Director 2045-N16
Страница 2: ......
Страница 3: ...IBM TotalStorage SAN256N Director 2045 N16 Installation and Maintenance Guide GC26 7714 00...
Страница 10: ...SAN256N Director 2045 N16 viii...
Страница 12: ...SAN256N Director 2045 N16 x...
Страница 18: ...SAN256N Director 2045 N16 xvi...
Страница 26: ...SAN256N Director 2045 N16 6...
Страница 84: ...SAN256N Director 2045 N16 64...
Страница 94: ...SAN256N Director 2045 N16 74...
Страница 97: ...Chapter 5 Hardware maintenance procedures 77 Figure 33 SAN256N director front chassis FRU locations 1 2...
Страница 120: ...SAN256N Director 2045 N16 100...
Страница 142: ...SAN256N Director 2045 N16 122...
Страница 144: ...SAN256N Director 2045 N16 124...
Страница 156: ......
Страница 157: ...Printed in USA GC26 7714 00...