1. Cut and stack all lumber in separate areas.
2. Nail BASE PLATES together overlapping ends as shown in Picture #1 to form base frame. Make sure base frame is square by making
diagonal measurements equal.
3.  Attach STUD BRACKETS (Picture #2) to base frame using measurements on plans.  Measurements are to center of brackets
4.  Begin arch assembly by sliding 2 RAFTERS into top ANGLE BRACKET and secure with screws.  Attach other 2 ANGLE BRACKETS
to RAFTERS and secure with screws.  In order to make sure each arch is built the same, stand 2x4 scraps in RIDGE BOARD slots
(Picture 3).  Stack the arches as you assemble them using the 2x4’s as alignment devices.
5. After the ANGLE BRACKETS have been attached to one side of all arches, carefully turn arches over and attach ANGLE BRACK-
ETS to other side while using the alignment devices mentioned in step 4.  Then attach left and right STUDS to RAFTERS and secure
using screws.
6. Nail CROSS TIE to each RAFTER so that ends are equal distances from top ANGLE BRACKET and flush with top edge of RAFTER.
Make sure to put the CROSS TIES toward the inside at each end of the building.
7. When all arches are complete, use two people to carefully lift each arch onto the assembled base frame and secure to STUD
BRACKETS with screws. Arches should be perpendicular to base frame (use a square). To hold the arches in a perpendicular
position, use 1X4's as temporary bracing as shown in drawing. The end arches should be flush with the base frame. Bend STUD
BRACKETS around each comer of base frame and secure with screws.
8. When all arches are in place, slide the RIDGE BOARDS into slots in ANGLE BRACKETS. You may need to tap them into place.
Make sure the arches are spaced on the RIDGE BOARDS exactly the same as they are on the base frame in accordance with the
plans for your size building. Secure RIDGE BOARDS with screws through holes in bottoms of ANGLE BRACKETS. Do each side first
and then install the top RIDGE BOARD.
9. Install DOOR JAMBS as shown in drawings for your building size. Use arch as a guide to mark top of DOOR JAMBS and cut at
that angle.
10. Install two VERTICAL STUDS in back wall. Nail top to CROSS TIE and toe nail bottom.
11. On the 7'X8' building, attach a 3"X8' plywood strip on each side of roof peak. On the 8'X14' building, attach a l’X14' plywood
strip on each side of roof peak. On the 10'X22' building, attach a 2'X22' plywood strip on each side of roof peak. This will result in
a slight overhang at the eaves.
12. Your building frame is now complete and ready to sheathe in the materials of your choice.

1. Square up base frame by measuring diagonally from comer to comer (must be equal distance).
2. Mark the spacing for the arches on the top boards of the base frame prior to assembly. Also mark the ridge boards with exactly
the same spacing.
3. Use pressure treated lumber for the bottom boards of the base frame (prevents rotting).
4. Temporarily brace arches (inside building) perpendicular to base frame using 1X4 boards until sheathing is in place (use a
square between base frame and arch). Leave nail heads out slightly so they can be easily pulled.
5. Install wall sheathing horizontally on sides of 7'X8' building. Install wall sheathing vertically on ends of 7'X8' building. Install
all wall sheathing vertically on larger size buildings. Install roof sheathing horizontally on all building sizes.
6. Roofing material may be metal, corrugated fiberglass, rolled roofing or shingles.
7. Doors can be cut from plywood sheathing. Outline each half with 1X4 boards to make them rigid. Screw hinges to door jambs.
On larger buildings, full sheets of plywood may be used to construct 8' doors.
8. On buildings over 16' long, stagger ridge boards so that seams are overlapping (i.e. start a 16' top board at one end of the
building and two 16' boards at the opposite end).
9. Optional1X4's may be used as comer trim.

U.S. Patent #5,524,397   Canadian Patent #2,227,540

415 Reservoir Road 

 Whitefish, MT  59937 

 1-406-253-5138 or 1-406-250-7054 

 Fax 1-800-880-3178

INSTRUCTIONS

HELPFUL HINTS (All Sizes)

/

8

CUT LIST (10’X22’ Building)

cut to 7’ 11 1/2”