Appendix E. Adapter Plugging Defaults
Units assembled at the factory follow the plugging rules that are described in this
appendix.
Plugging Sequences
Table E-1 illustrates how the slots are numbered: two rows of four slots, numbered
1 through 8:
The following tables show the default sequence of installation for the various
adapters.
¹
FC 2280 and FC 2281 are installed left to right, beginning with slot 1. A
maximum of six can be installed in any single IBM 2216.
¹
Other adapters are installed right-to-left in the first-available slot beginning with
slot 8 on the bottom and far right.
Table E-1. Slot Numbering
Slot 1
Slot 2
Slot 3
Slot 4
Slot 5
Slot 6
Slot 7
Slot 8
Table
E-2. FC 2280s (LIC 280s) and FC 2281s (LIC 281s)
first
third
fifth
second
fourth
sixth
Table
E-3. All Other Adapters
eighth
sixth
fourth
third
seventh
fifth
second
first
Copyright IBM Corp. 1997
E-1
Содержание Nways 2216
Страница 1: ...2216 Nways Multiaccess Connector ÉÂÔ Service and Maintenance Manual SY27 0350 02 ...
Страница 2: ......
Страница 3: ...2216 Nways Multiaccess Connector ÉÂÔ Service and Maintenance Manual SY27 0350 02 ...
Страница 8: ...vi 2216 Maintenance Manual ...
Страница 10: ...Common Tasks and the IBM 2216 Library viii 2216 Maintenance Manual ...
Страница 45: ...6 Remove the adapter from its location Chapter 2 Removal and Replacement Procedures 2 15 ...
Страница 60: ...3 6 2216 Maintenance Manual ...
Страница 84: ...4 24 2216 Maintenance Manual ...
Страница 104: ...A 2 2216 Maintenance Manual ...
Страница 106: ...Assembly 1 Final Assembly 2216 Model 400 B 2 2216 Maintenance Manual ...
Страница 110: ...B 6 2216 Maintenance Manual ...
Страница 114: ...1 2 3 4 5 6 7 8 9 10 Figure C 1 Power Cord Plugs by Country C 4 2216 Maintenance Manual ...
Страница 138: ...F 12 2216 Maintenance Manual ...
Страница 150: ...UWAGA Całkowicie wypełnione urządzenie IBM 2216 waży około 43 1 kg H 6 2216 Maintenance Manual ...
Страница 164: ......
Страница 167: ......