178
OPERATION
Device for lifting rods and casing pipes
HBR204-MU-6-eng.doc
OPERATION AND MAINTENANCE INSTRUCTION MANUAL
THIS DOCUMENT IS THE PROPERTY OF HÜETTE BOHRTECHNIK GMBH - TOTAL OR PARTIAL REPRODUCTION IS PROHIBITED
4.11.7.
Loading rods and casing pipes on the machine
The assembly between the rod and casing pipe must be done before using the lifting device.
-
Fasten the rope of the winch to the lifting device (3).
-
Position the telescopic jib (2).
-
Set the magnet support (3.2) on the casing tube.
-
The mobile rod (3.3) must protrude from the lower part of the casing pipe (10÷15 cm).
-
Lock the magnet in place (3.2).
-
Activate the winch (1).
-
Raise the lifting device until the mobile rod is can be coupled with the rod (9).
When the rod is equipped with the seat for the key, the end of the mobile rod will look like
a fork (10).
When the rod is not equipped with the seat for the key, the end of the mobile rod will look
like a hook (11).
4.14.6