
Figure 4-30 Installing a PE cable
(1) Site ground bar
----End
4.4.3 Installing Battery Modules and Cables
Context
D ANGER
● Before installing batteries, carefully read the battery safety precautions.
● During installation, wear insulation gloves and use insulated tools.
● Place the batteries correctly to prevent vibrations and shocks.
● Install the battery modules from bottom to top and from left to right to
prevent falling over due to imbalance.
● Two persons are required to install the battery modules.
Procedure
Step 1 Pull out the BCU for about 10 cm.
SmartLi 2.0
User Manual
4 Installation
Issue 09 (2022-01-30)
Copyright © Huawei Technologies Co., Ltd.
67