It is recommended that the cables between the SmartLi and the UPS be 50 m
or shorter. In a parallel SmartLi system, the power cables for each cabinet
should have the same length and specifications.
●
If more than eight SmartLi cabinets are connected in parallel, a maximum of
four 15 m parallel communications cables are supported.
4.1.4 Unpacking and Checking
Context
NO TICE
● To prevent the SmartLi from falling over, secure it to a pallet truck using ropes
before moving it.
● To prevent shocks or falls, move the SmartLi gently. After placing the SmartLi in
the installation position, unpack it and take care to prevent scratches. Keep the
SmartLi steady during unpacking.
● To prevent dust from settling on the SmartLi, leave the original plastic coat on
until installation is required.
● Battery modules are transported separately.
Procedure
Step 1 Use a pallet truck to transport the SmartLi to the installation position.
Step 2 Remove the SmartLi outer packing and take out the fittings box.
Step 3 Check that the SmartLi is intact.
1. Visually inspect the SmartLi appearance for shipping damage. If it is
damaged, notify the carrier immediately.
2. Check that all fittings comply with the packing list. If there is any discrepancy,
keep a record and contact the supplier immediately.
Step 4 After confirming that the cabinet is intact, remove the L-shaped bracket that
secures the cabinet and the pallet, and secure the sliding plate to the pallet using
the two M12 bolts that you have removed.
Step 5 Raise the four anchor bolts to the highest position using an adjustable wrench.
Step 6 Push the cabinet along the sliding plate to the floor.
----End
4.2 Installing a Fire Extinguisher Cylinder and Cabinets
(Without a Lithium Battery Side Cabinet)
SmartLi 2.0
User Manual
4 Installation
Issue 09 (2022-01-30)
Copyright © Huawei Technologies Co., Ltd.
42