2. Remove the drive top cover, as shown by 2 in
. Cut off the cable
ties using a pair of diagonal pliers, record the installation positions of the
relay wiring terminals and cable shield layer, and remove relay wiring
terminals 01, 02, 03, and communications terminals 61, 68, 69. Remove the
cable shield layer from the drive fixing plate at the shield point and replace
the control terminal with a new male connector from the drive fittings.
3. Extract the baffle plate of the upper chassis in the direction shown by 3 in
and draw out the cables.
Step 5 Remove the clamp for fixing the power cables on the input and output sides,
loosen the screws for securing the wiring terminals of the power cables using a
Phillips screwdriver, and draw out the power cables, as shown in
Figure 6-13 Removing input and output power cables
(1) Power cables on the output side
(2) Power cables on the input side
Step 6 Remove the drive ground cables on the input and output sides using a Phillips
screwdriver, as shown in
.
NetCol5000-A(025, 035) In-row Air Cooled Smart
Cooling Product
User Manual (600 mm Width)
6 System Operation and Maintenance
Issue 17 (2020-10-22)
Copyright © Huawei Technologies Co., Ltd.
214