5.6 Checking After Commissioning
lists the commissioning checklist.
Table 5-4 Commissioning checklist
Check Item
Actual Result
The controller exits the diagnostic mode.
□Passed. □Failed.
The temperature and humidity are properly set.
□Passed. □Failed.
All circuit breakers are on.
□Passed. □Failed.
The drainage button on the electrical control box is in the
position of normal humidifying.
□Passed. □Failed.
No oil stain exists on the copper pipe thermal insulation
foam or bottom plate, or it has been cleaned.
□Passed. □Failed.
5.7 Power Off
Procedure
Step 1 On the home page, tap Shutdown.
NO TICE
Exercise caution during operation because the unit is still live.
Step 2 Switch off the main circuit breaker QF1.
Step 3 If the smart cooling product needs to be maintained in power-off mode or long-
term power-off, switch off the smart cooling product external circuit breaker.
----End