Figure 3-6 Routing pipes from the bottom
(1) Inverted traps
(2) Oil traps
(3) Tilted gas pipe
(4) Tilted liquid pipe
Figure 3-7 Routing pipes from the top
(1) Inverted traps
(2) Oil traps
(3) Tilted gas pipe
(4) Tilted liquid pipe
3.2 Unpacking
Procedure
Step 1 Inspect the outer packing for signs of damage. If any damage is found, contact the
shipping company immediately.
Step 2 Unpack the product.
1. Remove the straps, top cover, outer packing, cushioning materials, and then
plastic film, as shown in
.
NetCol5000-A(025, 035) In-row Air Cooled Smart
Cooling Product
User Manual (600 mm Width)
3 Installation Guide
Issue 17 (2020-10-22)
Copyright © Huawei Technologies Co., Ltd.
36