Plan the Site Visit
25
Plan the Site Visit
After a careful review of the sales order, a Hewlett-Packard Site Preparation Specialist will make
arrangements for a preliminary on-site meeting. The purpose of this meeting will be to discuss the site
planning and preparation needs including electrical, mechanical, and physical system requirements.
Ideally, this meeting should be scheduled at least 60 days prior to the solution delivery date for the equipment
(see
“Develop the Schedule”
). If that is not feasible, it should be planned for the earliest possible date.
Key contact information for both the Hewlett-Packard Site Preparation Specialist and the customer should be
recorded and kept for reference:
The Hewlett-Packard Site Preparation Specialist and the customer contact should discuss and agree as to any
other participants included in the
Site Planning Team
.
Table 2
Customer information
Name:
Phone No:
Street:
City
or
Town:
State or Province:
Country
Zip or postal code:
Primary customer contact:
Phone No.:
Secondary customer contact:
Phone No.:
Traffic coordinator:
Phone No.:
Hewlett-Packard information
Sales representative
Order No:
Representative making survey
Date:
Scheduled delivery date
Содержание rp7400
Страница 1: ...rp7400 Hardware Manual ...
Страница 4: ...What s New 4 ...
Страница 6: ...System Overview 6 ...
Страница 15: ...rp7400 Enterprise Server System Safety and Regulatory Information 15 ...
Страница 16: ...rp7400 Enterprise Server System Safety and Regulatory Information 16 ...
Страница 17: ...rp7400 Enterprise Server System Safety and Regulatory Information 17 ...
Страница 18: ...rp7400 Enterprise Server System Safety and Regulatory Information 18 Declaration of Conformity ...
Страница 22: ...rp7400 Enterprise Server System Safety and Regulatory Information 22 ...
Страница 24: ...Review the Sales Order 24 ...
Страница 26: ...Plan the Site Visit 26 ...
Страница 28: ...Visit the Site 28 ...
Страница 32: ...Review HP Responsibilities 32 ...
Страница 36: ...Develop the Schedule 36 ...
Страница 38: ...Specify the Space for Unpacking 38 ...
Страница 44: ...Specify Hard Floor Requirements 44 ...
Страница 52: ...Specify the System Requirements 52 ...
Страница 56: ...Determine the ESD Requirements 56 ...
Страница 58: ...Determine the Acoustic Requirements 58 ...
Страница 60: ...Determine RFI Requirements 60 ...
Страница 62: ...Review Local Codes 62 ...
Страница 64: ...Determine Altitude Requirements 64 ...
Страница 68: ...Identify Sources of Electrical Interference 68 ...
Страница 70: ...Identify Other Environmental Influences 70 ...
Страница 72: ...Identify Telephone Requirements and Define Remote Access 72 ...
Страница 74: ...Identify Special Network Requirements 74 ...
Страница 76: ...Determine Service Access Needs 76 ...
Страница 78: ...Determine Fire Protection Requirements 78 ...
Страница 80: ...Define E Stop Requirements 80 ...
Страница 82: ...Determine Other Needs 82 ...
Страница 84: ...Generate the Plan 84 ...
Страница 86: ...Review the Plan With the Customer 86 ...
Страница 88: ...Execute the Site Plan 88 ...
Страница 94: ...Console Cable Connections 94 ...
Страница 96: ...HP 700 Series System Console Configuration 96 ...
Страница 100: ...Core I O Connections and Indicators 100 ...
Страница 104: ...Secure Web Console Installation 104 ...
Страница 106: ...LAN Console 106 ...
Страница 108: ...PC Direct Connect as System Console 108 ...
Страница 114: ...SCSI Devices 114 ...
Страница 118: ...Cable Management 118 ...
Страница 124: ...Cabinet Extension Kit 124 ...
Страница 134: ...rp7400 Server Boot up 134 ...
Страница 136: ...Accessing Guardian Service Processor Internal Port 136 ...
Страница 142: ...Chapter Shutting Down the SPU Shutting Down the SPU 2 ...
Страница 148: ...Adding a Disk Drive to an HP UX System 146 ...
Страница 162: ...Add I O Cards 160 ...