Specify the Space for Unpacking
37
Specify the Space for Unpacking
Specify Uncrating Space
rp7400 Systems are shipped in integrated cabinets on a 40in. x 48in. pallet. The combined height of the
packaged container and the pallets are as follows:
•
1.1 meter rack - 60in.
•
1.6 meter rack - 73in.
•
2.0 meter rack - 87in.
Allow a circular area approximately 12ft. in diameter room for uncrating the system and rolling the cabinet
off the pallet on rails. Allow additional space for temporary storage of the shipping containers and packing
materials.
Specify the Aisle Space
There should be enough clearance to move equipment safely from the receiving area to the computer room.
Permanent obstructions, such as pillars or narrow doorways, can cause equipment damage. Allow a minimum
of 2ft. clearance on either side of the cabinet or shipping container to allow for maneuvering the equipment.
Delivery plans should include the possible removal of walls or doors.
Содержание rp7400
Страница 1: ...rp7400 Hardware Manual ...
Страница 4: ...What s New 4 ...
Страница 6: ...System Overview 6 ...
Страница 15: ...rp7400 Enterprise Server System Safety and Regulatory Information 15 ...
Страница 16: ...rp7400 Enterprise Server System Safety and Regulatory Information 16 ...
Страница 17: ...rp7400 Enterprise Server System Safety and Regulatory Information 17 ...
Страница 18: ...rp7400 Enterprise Server System Safety and Regulatory Information 18 Declaration of Conformity ...
Страница 22: ...rp7400 Enterprise Server System Safety and Regulatory Information 22 ...
Страница 24: ...Review the Sales Order 24 ...
Страница 26: ...Plan the Site Visit 26 ...
Страница 28: ...Visit the Site 28 ...
Страница 32: ...Review HP Responsibilities 32 ...
Страница 36: ...Develop the Schedule 36 ...
Страница 38: ...Specify the Space for Unpacking 38 ...
Страница 44: ...Specify Hard Floor Requirements 44 ...
Страница 52: ...Specify the System Requirements 52 ...
Страница 56: ...Determine the ESD Requirements 56 ...
Страница 58: ...Determine the Acoustic Requirements 58 ...
Страница 60: ...Determine RFI Requirements 60 ...
Страница 62: ...Review Local Codes 62 ...
Страница 64: ...Determine Altitude Requirements 64 ...
Страница 68: ...Identify Sources of Electrical Interference 68 ...
Страница 70: ...Identify Other Environmental Influences 70 ...
Страница 72: ...Identify Telephone Requirements and Define Remote Access 72 ...
Страница 74: ...Identify Special Network Requirements 74 ...
Страница 76: ...Determine Service Access Needs 76 ...
Страница 78: ...Determine Fire Protection Requirements 78 ...
Страница 80: ...Define E Stop Requirements 80 ...
Страница 82: ...Determine Other Needs 82 ...
Страница 84: ...Generate the Plan 84 ...
Страница 86: ...Review the Plan With the Customer 86 ...
Страница 88: ...Execute the Site Plan 88 ...
Страница 94: ...Console Cable Connections 94 ...
Страница 96: ...HP 700 Series System Console Configuration 96 ...
Страница 100: ...Core I O Connections and Indicators 100 ...
Страница 104: ...Secure Web Console Installation 104 ...
Страница 106: ...LAN Console 106 ...
Страница 108: ...PC Direct Connect as System Console 108 ...
Страница 114: ...SCSI Devices 114 ...
Страница 118: ...Cable Management 118 ...
Страница 124: ...Cabinet Extension Kit 124 ...
Страница 134: ...rp7400 Server Boot up 134 ...
Страница 136: ...Accessing Guardian Service Processor Internal Port 136 ...
Страница 142: ...Chapter Shutting Down the SPU Shutting Down the SPU 2 ...
Страница 148: ...Adding a Disk Drive to an HP UX System 146 ...
Страница 162: ...Add I O Cards 160 ...