background image

Determine Altitude Requirements

64

Содержание rp7400

Страница 1: ...rp7400 Hardware Manual ...

Страница 2: ...terial Hewlett Packard assumes no responsibility for the use or reliability of its software on equipment that is not furnished by Hewlett Packard All rights are reserved No part of this document may be photographed reproduced or translated to another language without prior written consent of Hewlett Packard Company The information contained in this document is subject to change without notice HP w...

Страница 3: ...ted here are effective as of March 2010 New Sections On the Web Site System upgrade instructions for the PA8700 upgrade Modified Sections On the Web Site Identified changes to all sections as applicable to HP e3000 The current version of the Customer CD ROM was released August 2002 The web site will be identical to the CD ROM on September 2002 NOTE All references to rp74xx are equally applicable t...

Страница 4: ...What s New 4 ...

Страница 5: ...igned to operate using HP UX version 11 0 or newer The HP e3000 rp7400 is designed to operate using MPE iX release 7 0 uni processor support and MPE iX release 7 0 express multi processor support NOTE All references to rp7400 are equally applicable to the HP e3000 and n4000 KEY X Supported with MPE iX 7 0 X Supported with MPE iX 7 0 Express 1 Release X1 Supported with MPE iX 7 5 or later NOTE 1 an...

Страница 6: ...System Overview 6 ...

Страница 7: ...tion Electrical Safety Electrostatic Discharge ESD Precautions Battery Notice Cabinet Safety Precautions Declaration of Conformity FCC Statement USA Only Canada RFI Statement European Union RFI Statement Korean RFI Statement Taiwan RFI Statement Japan Safety and Regulatory Statements Acoustics Germany Australian C Tick Label Laser Safety Product Information For detailed information on the rp7400 E...

Страница 8: ...be easily accessible at all times Electrostatic Discharge ESD Precautions When handling any electronic component or assembly such as a PCI card or Memory SIMM you must observe the following antistatic precautions to prevent damage An ESD kit HP P N A3024 80004 is available or supplied with Memory additions This kit contains one wrist strap one conductive sheet and one anti static foam pad Always w...

Страница 9: ...ain stability Only one slideable product must be extended at a time Sicherheitsvorkehrungen für Einbaugehäuse WARNING Einbaugehäuse haben auch ohne Inhalt ein hohes Gewicht Seien Sie also vorsichtig wenn Sie ein Gehäuse hin und her bewegen sei es mit oder ohne installierten Innenteilen Rollen Sie das Gehäuse nach Möglichkeit nicht über rauhe oder unebene Oberflächen bzw Oberflächen mit mehr als 10...

Страница 10: ...arrière doivent tous deux rester en place pour assurer la stabilité de l armoire Vous ne devez faire glisser hors de l armoire qu un seul élément coulissant à la fois Medidas de seguridad para armarios WARNING Los armarios son pesados aun cuando estén vacíos Tenga cuidado cuando mueva los armarios independientemente de que haya equipo instalado en el armario o no Evite desplazar los armarios sobre...

Страница 11: ... lugares adequados para garantir a estabilidade da peça Deve se abrir apenas uma parte deslizante por vez Precauzioni di siccurezza sugli armadi WARNING Gli armadi sono molto pesanti anche quando sono vuoti Esercitare la massima cautela durante lo spostamento degli armadi indipendentemente dal fatto che l apparecchiatura sia installata o meno Evitare di far scorrere gli armadi su superfici irregol...

Страница 12: ... stabiliteten upprätthålls De inskjutningsbara produkterna får bara dras ut en i sänder Voorzorgsmaatregelen voor de veiligheid voor kasten WARNING Kasten zijn zwaar ook als deze leeg zijn Ga voorzichtig te werk als u een kast verplaatst of er nu wel of niet apparatuur in de kast is geïnstalleerd Rol kasten niet over ruwe of ongelijke oppervlakken of hellingen van meer dan 10 graden Als u een kast...

Страница 13: ... anti tip fødder blive siddende for at opretholde stabiliteten Der må kun trækkes en udtræksdel ud ad gangen Sikkerhetsforanstaltninger for skapene WARNING Skapene er tunge selv når de er tomme Vær forsiktig når du flytter skap uansett om de er tomme eller inneholder utstyr Ikke rull skap på ru eller ujevne overflater eller i skråninger som heller mer enn 10 grader Det trengs minst to personer til...

Страница 14: ...tää 10 astetta Kaappien ottamiseen alas lastausalustalta ja niiden siirtämiseen tarvitaan ainakin kaksi henkilöä WARNING Liukuvia osia ei pidä vetää ulos kaapista laitteen ollessa lastausalustalla Kaappi täytyy ottaa alas alustalta ja sekä etummaisen että takimmaisen kallistustuen täytyy olla asennettu ennen liukuvien osien vetämistä ulos WARNING Kun kallistustuet on asennettu ne täytyy jättää pai...

Страница 15: ...rp7400 Enterprise Server System Safety and Regulatory Information 15 ...

Страница 16: ...rp7400 Enterprise Server System Safety and Regulatory Information 16 ...

Страница 17: ...rp7400 Enterprise Server System Safety and Regulatory Information 17 ...

Страница 18: ...rp7400 Enterprise Server System Safety and Regulatory Information 18 Declaration of Conformity ...

Страница 19: ...armful interference in which case the user will be required to correct the interference at his own expense Hewlett Packard s system verification tests were conducted with HP supported peripheral devices and HP shielded cables such as those you receive with your computer Changes or modifications not expressly approved by Hewlett Packard could void the user s authority to operate the equipment Cable...

Страница 20: ...rp7400 Enterprise Server System Safety and Regulatory Information 20 Korean RFI Statement Taiwan RFI Statement Japan Safety and Regulatory Statements ...

Страница 21: ...internal to the Optical Link Module OLM for connection to the Fibre communications port In the USA the OLM is certified as a Class 1 laser product conforming to the requirements contained in the Department of Health and Human Services DHHS regulation 21 CFR Subchapter J The certification is indicated by a label on the plastic OLM housing Outside the USA the OLM is certified as a Class 1 laser prod...

Страница 22: ...rp7400 Enterprise Server System Safety and Regulatory Information 22 ...

Страница 23: ...gh the Support Connect system and through the WWOMS World Wide Order Management System Carefully review the sales order information to assess the number of integrated systems ordered the number of peripheral cabinets ordered the number and type of PDUs special configuration requirements delivery dates ...

Страница 24: ...Review the Sales Order 24 ...

Страница 25: ...not feasible it should be planned for the earliest possible date Key contact information for both the Hewlett Packard Site Preparation Specialist and the customer should be recorded and kept for reference The Hewlett Packard Site Preparation Specialist and the customer contact should discuss and agree as to any other participants included in the Site Planning Team Table 2 Customer information Name...

Страница 26: ...Plan the Site Visit 26 ...

Страница 27: ...isit the Site 27 Visit the Site During the preliminary site visit it is important that the Hewlett Packard Site Preparation Specialist and the customer representative accomplish the following major tasks ...

Страница 28: ...Visit the Site 28 ...

Страница 29: ... electrical codes Local safety codes Space and weight limitations system accessibility Environmental requirements temperature humidity etc Electrical and grounding requirements Acoustics If your computer is to be installed in an existing computer room you should analyze the following items and integrate them into your site plan Available space Environmental requirements Electrical requirements Air...

Страница 30: ...tor is responsible for the following tasks Establishing and maintaining site preparation schedules Coordinating construction efforts Primary liaison with Hewlett Packard representatives Principal Operator The Principal Operator is responsible for the following tasks System operation Monitoring site preparation Ordering computer supplies Scheduling user training Maintaining maintenance schedules Si...

Страница 31: ...fication Visit A Hewlett Packard Site Preparation Specialist will verify that your site meets or exceeds your computer system s requirements and specifications prior to and during system installation Sites failing to meet the system requirements and specifications may incur additional service charges Hewlett Packard provides service under the conditions of the Computer Products Warranty Installati...

Страница 32: ...Review HP Responsibilities 32 ...

Страница 33: ...t loading 7 Are there channels or cutouts for cable routing 8 Is there a remote console telephone line available with an RJ11 jack 9 Are telephone lines for remote support available 10 Are customer supplied peripheral cables available 12 Is a lift tool available if required Power and lighting No Area or condition Yes No 13 Are lighting levels adequate for maintenance 14 Are there ac outlets availa...

Страница 34: ...s 27 Are the proper tools and installation equipment available Cooling No Area or condition Yes No 28 Can cooling be maintained between 54 and 86 F 20 and 30 C 29 Can temperature changes be held to less than 10 C per hour 30 Can humidity level be maintained between 40 and 60 31 Are air conditioning filters installed Storage No Area or condition Yes No 32 Are cabinets available for tape and disc me...

Страница 35: ...ion equipment installed Major facility changes completed Special delivery requirements defined Site inspection survey completed Delivery survey completed Signed copy of the site inspection and delivery survey mailed to Hewlett Packard Site inspection and predelivery coordination meeting arranged with a Hewlett Packard Site Preparation Specialist to review the inspection checklist and arrange a sol...

Страница 36: ...Develop the Schedule 36 ...

Страница 37: ...ncrating the system and rolling the cabinet off the pallet on rails Allow additional space for temporary storage of the shipping containers and packing materials Specify the Aisle Space There should be enough clearance to move equipment safely from the receiving area to the computer room Permanent obstructions such as pillars or narrow doorways can cause equipment damage Allow a minimum of 2ft cle...

Страница 38: ...Specify the Space for Unpacking 38 ...

Страница 39: ... and electrical continuity are improved over the free standing system Bolt in stringer a metal bar extends from one pedestal to the next but the bar is bolted into place providing additional electrical and mechanical security The system provides the best electrical continuity and weight distribution Bolt in String System grounding One approach to grounding for bolt in stringer systems go around th...

Страница 40: ...trance ground and HP N4000 server equipment The use of conductive floor tiles with this style of grid further enhances ground performance Adequate If the preceding systems are impossible to implement contact a local Hewlett Packard site preparation specialist Arrangements can be made to provide custom lengths of ground braid to interconnect system cabinets However connecting system cabinets with c...

Страница 41: ...ing under the raised floor and distributed to the heat loads out in the data processing area Return air is routed back to the tops of the process control HVAC units This can create some potential problems Concrete sub flooring should be sealed but often is not Concrete continues to shed over its lifetime and will add to humidity control problems Improper cable routing can and does cause air flow d...

Страница 42: ...rd exists some method to curb this must be used For instance any non current carrying metallic part of a structure that could be energized and touched by personnel has to be grounded With all of the power and data cables routed beneath the flooring and pulled up into the data are the chances for short exist As the tiles are metallic clad it is conceivable that the shock hazard may exist For this r...

Страница 43: ...omputer room that does not have a raised floor The power drops and interface cables from the SPU are routed down through the cable guides and into the cable trough The cable trough connects to the bottom of a power panel It should be sized to hold all cables and receptacles for the power drops that come from the SPU and peripheral cabinets ...

Страница 44: ...Specify Hard Floor Requirements 44 ...

Страница 45: ... power strips attached to the HP rp7400 cabinet CAUTION HP does not recommend and does not support the use of ferro active or ferro resonant power correction in conjunction with the rp7400 server These type of line conditioners represent an older technology that is not compatible with the most recent designs in active PFC power supplies such as those in the HP rp7400 servers Ferro active or ferro ...

Страница 46: ...s 46 30A modular PDU HP product number E7681A North America or E7682A International This PDU has eight C13 outlets and two C19 outlets split across two 20A branch circuits max 30A available The PDU power cord has an L6 30 plug ...

Страница 47: ...ht conduit that is securely connected together or bonded to panels and electrical boxes so as to provide a continuous grounding system Power panel ground Each power panel should be grounded to the electrical service entrance with green green yellow wire ground conductors The green green yellow wire ground conductors should be sized per applicable codes based on circuit over current device ratings ...

Страница 48: ...oor must be designed as a ground grid with bolted down stringers and tin lead or zinc plating to provide low resistance and attachment points for connection to service entrance ground and HP rp7400 server equipment The use of conductive floor tiles with this style of grid further enhances ground performance Adequate If the excellent or good ground grid systems are impossible to implement contact y...

Страница 49: ...r See the figure following for details Equipment grounding implementation details If it has been determined to be necessary connect all Hewlett Packard equipment cabinets to the site ground grid as follows Attach one end of each ground strap to the applicable cabinet ground lug Attach the other end to the nearest pedestal base raised floor or cable trough ground point nonraised floor Check that th...

Страница 50: ...ement compound similar to Burndy Penetrox Cable trough top Ground connection of panel ground wire inside trough Hex bolt bellville washer and nut Open end at panel Hex bolt bellville washer and nut Grounding braid to computer equipment Drill trough as required Cable trough Ground wire Cable trough top and cable trough is used as grounding system 6 1 97 EXSM008 ...

Страница 51: ...gured to operate over its rated operating ranges 200 to 240 VAC AC Input Line frequency 50 to 60 Hz AC Input Current 18 A max load at 200 VAC 12 A max load at 240 VAC AC Inrush Current TBD AC Input Power 1250 VA maximum Power Supply Output Rating 1163 watts DC continuous Holdup without system reset 25ms at 50 60Hz 1 cycle or 500ms Battery Backup Time 15 minutes With optional external PowerTrust UP...

Страница 52: ...Specify the System Requirements 52 ...

Страница 53: ...nce and can be replaced while the system is on line Single point of failure is reduced to the PDU or PowerTrust UPS to which the power supply power cords are connected Cabinet level Enhanced Power Availability At the equipment cabinet level enhanced power availability is achieved by interweaving the three power supply power cords across different branch circuits in the PDUs The following illustrat...

Страница 54: ...ilability power beyond the scope of the equipment provided by Hewlett Packard Computer room high availability can be achieved by multiple substation power feeds off a single power substation feeds from multiple power substations Such implementations are costly and complex but have the advantage of eliminating single point of failure to the equipment ...

Страница 55: ...les Use conductive wax if waxed floors are necessary Ensure that all equipment and flooring are properly grounded and are at the same ground potential Use conductive tables and chairs Use a grounded wrist strap or other grounding method when handling circuit boards Store spare electronic modules in antistatic containers Table 5 Personnel activitya a Source B A Unger Electrostatic Discharge Failure...

Страница 56: ...Determine the ESD Requirements 56 ...

Страница 57: ...e following means Dropped ceiling Cover with a commercial grade of fire resistant acoustic rated fiberglass ceiling tile Sound deadening Cover the walls with curtains or other sound deadening material Removable partitions Use foam rubber models for most effectiveness Sound power 7 5 Bels LwA maximum at 31oC Sound pressure 61 dB maximum at 31o C in operator position 58 dB maximum at 31o C in standb...

Страница 58: ...Determine the Acoustic Requirements 58 ...

Страница 59: ...cification Radiated Field Immunity 10 Volts Meter 14KHz to 1 GHz Magnetic Field Immunity 1 Gauss 47 5 Hz to 198 Hz Electrostatic Discharge Immunity 15 kV Maximum with no loss of function 25 kV Maximum with no component damage Electrostatic Contact Discharge 4 kV CD 8kV AD No Effect ...

Страница 60: ...Determine RFI Requirements 60 ...

Страница 61: ...ipment The customer is responsible for making sure their computer system installation is in compliance with all local laws regulations and codes for mechanical building and electrical distribution systems prior to system installation The Hewlett Packard Site Preparation Specialist can assist in determining your local regulations ...

Страница 62: ...Review Local Codes 62 ...

Страница 63: ...ose supplied by Hewlett Packard have vacuum column transport mechanisms that are affected by atmospheric pressure Adjustments to these mechanisms may be required to compensate for the lower atmospheric pressure at higher altitudes Maximum Altitude Operational 3000 meters above sea level Non operational 4500 meters above sea level ...

Страница 64: ...Determine Altitude Requirements 64 ...

Страница 65: ...rature is derated reduced by 2o C for each 1000 meters above sea level up to a maximum of 3000 meters 20oC to 25oC 68o F to 77o F b 10oC 50oF per hour With tape media 20o C 68o F per hour Without tape media 40oC to 70oC 40o F to 158o F Operating Humiditya 15 to 80 Relative humidity Non condensing at 35o C 95o F 40 to 60 Relative humidity Non condensing 30 Per hour Relative humidity Non condensing ...

Страница 66: ...Determine Temperature Humidity Requirements 66 NOTE Operating ranges refer to the ambient air temperature and humidity measured at the cabinet cooling air intake vents ...

Страница 67: ...eration of janitorial equipment can induce electrical noise and cause abnormal operation of the computer system Your electrician can verify whether or not maintenance outlets are on separate panels Lightning In some geographical areas it may by advisable to install lightning protection for both personnel and computer systems In the United States USA the installation of lightning or surge arrestors...

Страница 68: ...Identify Sources of Electrical Interference 68 ...

Страница 69: ...apors such as those from liquid spirit duplicating equipment and wet process photo copiers can also cause damage Some of the most common contaminants are dust smoke ash eraser debris food crumbs and salty air Electrostatic Discharge If there is an abnormally high level of static electricity at your computer system s location 15 KV or higher personnel will probably be sparking upon contact with the...

Страница 70: ...Identify Other Environmental Influences 70 ...

Страница 71: ...he secure console LAN which is separate from the site or computer room s campus LAN NOTE If modem access is an element of the customer s High Availability plan telephone lines for multiple modems may be required The system internal modem is equipped with an RJ11 telephone connector For North American installations the customers telephone jack must comply with RJ11 specifications The RJ11 connector...

Страница 72: ...Identify Telephone Requirements and Define Remote Access 72 ...

Страница 73: ... address The Guardian Service Processor as a separate network device has to have its own IP address gateway and subnet mask configured at the site in order to be separately addressed The service processor does not support DHCP so the IP address must be assigned out of a separate pool from any that are assigned dynamically The remote web console if used requires it own IP address ...

Страница 74: ...Identify Special Network Requirements 74 ...

Страница 75: ...ont and rear of the rp7400 SPU should not take precedence over local codes and regulations However HP does require a minimum of 0 91 meter 3 ft of clearance on the front or back along with 1 22 meter 4 ft on the opposite side front preferred to allow for future add on installations HP suggests consulting your local authority having jurisdiction familiar with the current regulations for compliance ...

Страница 76: ...Determine Service Access Needs 76 ...

Страница 77: ...consulted for suggestions and recommendations as to the adequacy of existing or proposed fire control systems If a new site is to be built or an existing structure modified consult local building codes for fire prevention and protection Also consult with the Hewlett Packard Site Preparation Specialist and local fire inspector for additional information ...

Страница 78: ...Determine Fire Protection Requirements 78 ...

Страница 79: ... and a thermostat device Electrical codes commonly stipulate that this button will remove both power AND airflow from the computer room This is for deactivating all equipment power in case of an emergency or in case room temperature exceeds safe operating conditions Check the local electrical codes to see whether the E stop switch is optional or required ...

Страница 80: ...Define E Stop Requirements 80 ...

Страница 81: ... an accident Copies of vital data should be stored well away from the computer area normally in some type of fireproof storage device A regular updating process should be put into place to ensure that the value of the stored information is maintained Electronic data processing insurance is also available to cover both hardware and software Contact your local Hewlett Packard Sales and Service offic...

Страница 82: ...Determine Other Needs 82 ...

Страница 83: ...r room space planning can also be performed using scaled templates and cutouts In order to complete the computer room layout the Hewlett Packard site preparation specialist will need to do the following Get the computer room dimensions from the customer Identify the locations for the system cabinet peripherals and other equipment Identify the locations of the various utilities and datacomm equipme...

Страница 84: ...Generate the Plan 84 ...

Страница 85: ...ptacles have been ordered Verify that grounding requirements have been met Space needs Verify that sufficient space exists for uncrating and installing the equipment Verify that serviceability space has been included in the floor layouts Cooling needs Verify that the customer site air conditioning meets the requirements for rp7400 systems Verify that the configuration of the system cabinets does n...

Страница 86: ...Review the Plan With the Customer 86 ...

Страница 87: ...on should be completed 30 days prior to the scheduled installation date The Hewlett Packard site preparation specialist may assist in arranging for the necessary contractors if requested by the customer It is the customer s responsibility to ensure their computer system site is in compliance with all local laws regulations and codes for mechanical building and electrical distribution systems prior...

Страница 88: ...Execute the Site Plan 88 ...

Страница 89: ...d system is one in which the SPU and other components have been shipped from the factory pre installed in a cabinet This reduces the amount of on site time required to place a system into service Tools Required or Recommended For Installation Torx drivers T 15 and T 25 ...

Страница 90: ...es such as door jambs and ramps and large irregularities or obstructions on the floor Use extreme caution when moving the cabinet without the anti tip feet installed Always reinstall the anti tip feet as soon as the obstacle has been cleared The anti tip feet as well as the cabinet leveling stabilizer feet should be fully lowered and secured once the cabinet is in place Failure to follow these pre...

Страница 91: ...net near the front 3 At the rear of the cabinet a Open the door b Remove the anti tip foot by removing and retaining the two 2 1 2 inch bolts c Remove the two 2 L brackets revealed by removing the anti tip foot 4 Remove the two ramps from the pallet and carefully place them into the slots at the front of the pallet Rear Front 1 1 2 3 1 Shipping L Bracket 2 Shipping Pallet Bolts For Shipping L brac...

Страница 92: ...e server from the pallet Do not move the cabinet unless the anti tip feet are installed The cabinet can tip if care is not used Due to their low ground clearance the feet may catch on irregularities on the floor thresholds or ramps 6 Install the front and rear anti tip feet using the 1 2 inch bolts provided Ensure that the anti tip feet are installed in the fully up position in the mounting slots ...

Страница 93: ...low direct you to instructions covering how to install console connections on the rp7400 system Console Connections HP 700 series system console connections Secure Web Console connections LAN Console connections Direct Connect PC as a Console ...

Страница 94: ...Console Cable Connections 94 ...

Страница 95: ...the steps to configure the HP700 series terminal for VT 100 operation NOTE You may use either the arrow keys or the tab key to move between the setting options on the screen 1 Press config keys function key f8 2 Press terminal config function key f5 3 Move to Terminal ID and enter vt100 4 Move to Set TermMode and using the Prev and Next keys select EM100 5 Press the config keys function key f8 6 P...

Страница 96: ...HP 700 Series System Console Configuration 96 ...

Страница 97: ... that a data packet has been transmitted over the 10BASE T Console LAN 8 Green 10BASE T 100BASE T Mode LED When lit indicates that the LAN is in 100 Mbps Mode When unlit indicates that the LAN is in 10 Mbps Mode 9 Amber 10BASE T 100 BASE T LAN Collision LED When lit indicates that a data packet collision has occurred on the 10BASE T 100BASE T LAN 10 Green 10BASE T 100BASE T LAN Link OK LED When li...

Страница 98: ...ation and configuration of the rp7400 system console rp7400 RS 232 Local System Console Installation The following describes how to install a system console on an rp7400 system The HP 700 series terminal is used as an example Other terminals may be used as a system console as long as they are configured for VT100 terminal emulation mode 1 Connect one end of a serial cable to the port labeled Local...

Страница 99: ...OTE You may use either the arrow keys or the tab key to move between the setting options on the screen 1 Press config keys function key f8 2 Press terminal config function key f5 3 Move to Terminal ID and enter vt100 4 Move to Set TermMode and using the Prev and Next keys select EM100 5 Press the config keys function key f8 6 Press the ansi config function key f6 7 Move to multipage and using the ...

Страница 100: ...Core I O Connections and Indicators 100 ...

Страница 101: ...Web Console on an rp7400 server For technical data installation and configuration instructions for the Secure Web Console see the following web site http www hp com go hp9000_servers docs NOTE Either one system console HP series 700 terminal or the HP Secure Web Console may be installed on an rp7400 server at the same time Cabinet ...

Страница 102: ...all the wire mounting bracket by carefully inserting the two top prongs without the plastic caps into the vent grill at the rear of the server chassis Position the bracket in the top row of holes at the center 2 Place the Secure Web Console power supply into the bottom portion of the wire mounting bracket as shown 3 Connect one end of the power cable to the power supply where indicated ...

Страница 103: ...ent unauthorized access to your rp7400 system do not connect the other end of the serial cable to the Secure Web Console until both the rp7400 and the Web Console have both been fully configured 8 Connect the other end of the power cable into an available plug on a cabinet PDU 9 Configure the Secure Web Console in accordance with the documentation that was provided with it or refer to http eproduc...

Страница 104: ...Secure Web Console Installation 104 ...

Страница 105: ... server must first be configured via an HP700 system console before accessing it from a PC or UNIX system 1 Connect a cable between your PC s network adapter and the 10BaseT LAN Console port on the rear of the rp7400 server 2 Launch your terminal emulator software and set emulation to VT100 3 Connect to the rp7400 server by entering the IP address for its Guardian Service Processor GSP and press E...

Страница 106: ...LAN Console 106 ...

Страница 107: ...n This process uses a terminal emulator software package set to emulate a VT100 terminal 1 Connect a serial port adapter cable between your PC s serial port and the Local Console Serial Port on the rear of the rp7400 server 2 You should have the HP UX prompt at this point 3 You can now log onto the system or go into the GSP with ctrl b ...

Страница 108: ...PC Direct Connect as System Console 108 ...

Страница 109: ...osure is connected to the rp7400 by a 68 pin VHDCI connector on the Core I O connector panel SCSI Termination This section provides an overview of SCSI termination The rp7400 has three SCSI buses Two internal buses off of a dual channel controller and one external accessed through a 68 pin VHDCI connection on the Core I O board Each internal bus contains one disk drive which is terminated The exte...

Страница 110: ...183 2655 Model Number Description C4318SZ HP SMART Family of Storage Enclosures Modules Highlander C4314A SMART Desktop DVD ROM SCSI 2 module C4315A SMART Rack Ready DVD ROM SCSI 2 module C6382A DLT4000 Desk Top Narrow Differential Tape Drive C6383A DLT4000 Rack Ready Narrow Differential Tape Drive C6362A 4 8GB DDS2 Desktop DAT Drive SE SCSI II C6363A 4 8GB DDS2 Rack Ready DAT Drive SE SCSI II C63...

Страница 111: ... menu The command has as variety of uses including Displaying and setting the SCSI transfer rates Displaying and setting SCSI controller initiator IDs Displaying and Setting SCSI Transfer Rate To set the SCSI transfer rate access the BCH menu and proceed as follows 1 At the BCH prompt enter SCSI rate HW path rate NOTE The default rate equals ultra for the Core I O internal drives The default rate ...

Страница 112: ...d s that have been programmed SCSI controllers that are in PCI slots that have not been altered from default will not show up Only core controllers are displayed until the other slots are programmed 4 Set the SCSI initiator ID of a controller at 0 0 2 1 Command SCSI Response Path dec Initiator ID SCSI Rate 0 0 2 0 5 Ultra 0 0 2 1 7 Ultra 0 0 1 0 7 No Limit 5 0 0 6 Fast 12 0 0 6 Fast 12 0 1 6 Fast ...

Страница 113: ...CSI bus cntlr 0 0 1 0 0x1000 0xc 0 Built_In SCSI bus cntlr 0 0 2 0 0x1000 0xf 0 Built_In SCSI bus cntlr 0 0 2 1 0x1000 0xf 0 Built_In Comp ser cntlr 0 0 4 0 0x103c 0x1048 0 Built_In Comp ser cntlr 0 0 5 0 0x103c 0x1048 0 Built_In Ethernet cntlr 0 2 0 0 0x1011 0x19 16 6 SCSI bus cntlr 0 5 0 0 0x1000 0xf 40 1 SCSI bus cntlr 0 8 0 0 0x1000 0xb 64 4 SCSI bus cntlr 0 8 0 1 0x1000 0xb 64 4 SCSI bus cntl...

Страница 114: ...SCSI Devices 114 ...

Страница 115: ... critical that cables be neat and dressed to allow movement without the need for re cabling the SPUs The cable management scheme inside the cabinet consists of cable guides located on the left and right sides of the chassis extending out from the back of the chassis These cable guides in conjunction with plastic and velcro tie wraps should provide appropriate strain relief and cable management for...

Страница 116: ...secured to the cable guides they should then be routed down the sides of the cabinet There are slits in the cabinet vertical supports that allow the velcro tie wraps to go through once you have bundled the cables together This is one method for securing the cables inside the cabinet Cable Guide 3 SCSI Cables Power Cords with plastic tie wrap Core I O console and LAN cables Velcro Tie wraps holding...

Страница 117: ...ral component bays installed you would want to cable from the bottom up Be sure to leave an adequate service loop in the cables so the SPU can be extended out the front or back of the cabinet Some cables may have to be loosened or re positioned to access and SPU in the middle positions of the cabinet CAUTION Always be aware of cable interference while moving an SPU Cable or connector damage could ...

Страница 118: ...Cable Management 118 ...

Страница 119: ...s a list of parts that should be in each kit Table 7 Cabinet Expansion Kit Contents Part Number Description Quanti ty Locator No A3639 0023 0 Front anti tip foot See Warning 1 1 A3639 0023 1 Rear anti tip foot See Warning 1 2 A5541 0000 1 1 2m side panel see note 1 2 3 A5542 0000 1 1 6m side panel see note 1 2 4 A5543 0000 1 2 0m side panel see note 1 2 5 A5543 0000 2 Door hinge 2 6 A5543 0000 3 D...

Страница 120: ...ained in the kit Note 2 Quantities are 18 for A5541A 19 for A5542A and 23 for A5543A Figure 1 Exploded view of Cabinet with Extension Kit A5543 0000 6 Door support bracket 1 12 5183 1866 Cabinet forehead plastic 1 13 Table 7 Cabinet Expansion Kit Contents Continued Part Number Description Quanti ty Locator No ...

Страница 121: ...new shipping material is needed pallet ramps box and top cap DO NOT try to use the original shipping material with the new cabinet The cabinet must either be packaged with the new material or shipped via padded van WARNING The anti tip feet must be installed to ensure cabinet stability Failure to do so could result in injury and equipment damage ...

Страница 122: ...place the deep top panel over the top of the cabinet with the front angled down and slightly forward so the tabs on the top panel can slide back into the slots on the front of the cabinet Lower the back of the top panel down and pull the top panel toward the back until it is fully seated on top of the cabinet 2 Snap the new plastic cabinet forehead onto the front edge of the top panel 3 Start a sc...

Страница 123: ...he cabinet leveler feet at all four corners of the cabinet Be sure the leveler feet contact the floor surface 2 Place the solid front anti tip foot so the slotted holes align with the threaded holes on the bottom edge of the cabinet frame 3 Insert four bolts and washers two each side through the anti tip foot into the cabinet frame 4 Press down on the anti tip foot until it touches the floor then ...

Страница 124: ...Cabinet Extension Kit 124 ...

Страница 125: ... GSP configuration Go to the appropriate section for the task that you wish to accomplish Configuring the GSP LAN Port Perform the LAN configuration from the systems local port either console or the HP secure web console NOTE The GSP has a separate LAN port from the system LAN port It will need a separate LAN drop IP address and networking information from the port used by HP UX Before starting th...

Страница 126: ... are Login Timeout 1 minutes Number of password Faults allowed 3 Flow Control Timeout 5 minutes Do you want to modify the GSP wide parameters Y N __ At this point you can modify the GSP wide parameters or continue with adding users To add users respond N for no NOTE If this is the first time users are being added the first user added will be the GSP administrator If this is not the first time you ...

Страница 127: ... following steps 1 Go into the GSP with the ctrl b entry 2 At the GSP prompt enter the Security options and access control SO command GSP so 3 The first prompt you will see with the so command is for GSP wide parameters GSP wide parameters are Login Timeout 1 minutes Number of password Faults allowed 3 Flow Control Timeout 5 minutes Do you want to modify the GSP wide parameters Y N __ At this poin...

Страница 128: ...into the GSP with the ctrl b entry 2 At the GSP prompt enter the Default Configuration dc command GSP dc 3 Follow the prompts for the dc command and be sure to have the change information available CAUTION When the Security configuration is reset all users are removed including the GSP administrator It also disables the remote Remote must be re enabled through the main console using the Enable Rem...

Страница 129: ...tem The length of time an rp7400 will require to boot up depends on the number of processors and the amount of RAM memory installed Average configurations can take up to 20 minutes or more The boot process consists of the following main steps ...

Страница 130: ...ng power to the rp7400 server and booting the system up to the UNIX Login prompt The amount of time it takes to go through self test and boot the system will vary widely depending on hardware configuration The following provides a typical procedure yours may vary depending on software and hardware installed 1 Apply AC Power to the system console if you haven t already done so ...

Страница 131: ...rp7400 Server Boot up 131 2 Apply power to the rp7400 server by turning the front panel switch to ON Power Switch Under Cover ...

Страница 132: ...t 612A I O config 8238 EARLY BOOT VFP End of early boot detected Firmware Version XX XX Duplex Console IO Dependent Code IODC revision 1 c Copyright 1995 1998 Hewlett Packard Company All rights reserved Processor Speed State CoProcessor State Cache Size Number State Inst Data 1 440 MHz Active Functional 512 KB 1 MB 3 440 MHz Idle Functional 512 KB 1 MB Central Bus Speed in MHz 120 Available Memory...

Страница 133: ... menu Displays service commands DIsplay Redisplay the current menu HElp menu command Display help for menu or command RESET Restart the system Main Menu Enter command or menu 5 To start the boot process using the primary boot path enter BO PRI at Boot Console Handler BCH main menu prompt and press ENTER NOTE Booting a system to a UNIX login prompt from BCH main menu can take 20 minutes or longer d...

Страница 134: ...rp7400 Server Boot up 134 ...

Страница 135: ...e file when you have finished using it 5 The internal port can be accessed via terminal emulators such as cu To use cu you need the follow entries the entries must be exactly as shown usr lib uucp Systems needs the following entry gspiport Any 5 gspiport f900 r d r d r ogin BREAK ogin uucp asswrd uucp BREAK ogin uucp asswrd uucp The spelling looks unusual but it needs to be exactly as shown usr li...

Страница 136: ...Accessing Guardian Service Processor Internal Port 136 ...

Страница 137: ...te or LAN console access Help HE Display the list of available commands Admin IT Modify GSP inactivity timeouts Config LC Configure LAN connected and PPP console Paging LR Reserve Modem for Paging Console LS Display LAN connected and PPP console status Remote MR Modem Reset Remote MS Display the status of the Modem Remote PC Remote Power Control Paging PG Configure Paging Status PS Display the sta...

Страница 138: ... GSP inactivity timeouts Admin RP Reset password configuration Admin SO Configure security options and access control Admin TE Sends a message to other terminals Admin WHO Display a list of GSP connected users Table 10 SP Chassis Code Commands Function Command Definition Chassis Codes CE Log a chassis code in the GSP chassis code history buffer Chassis Codes VFD Activates the immediate display of ...

Страница 139: ...ion Command Definition Help HE Display the list of available commands Table 14 SP Paging Commands Function Command Definition Paging LR Reserve Modem for Paging Paging PG Configure Paging Table 15 SP Remote Commands Function Command Definition Remote DI Disconnect remote or LAN console Remote DR Disable remote or LAN console access Remote ER Enable remote or LAN console access Remote MR Modem Rese...

Страница 140: ...on Session SE Activate a system session on local or remote port 1 session remote and local console Session TC System reset through INIT signal Session TN Start a Telnet session on local or remote port Table 18 SP Status Commands Function Command Definition Status PS Display the status of the Power Management Module Status SL Display SPU status logs Table 19 Uncategorized commands Function Command ...

Страница 141: ...m a normal Operating System shut down Be sure to inform all logged on users of the impending shutdown Step 3 After the Operating System has halted set the Power switch to the standby O position Step 4 Remove power from the SPU by unplugging the power cords up to 3 power cords from the rear of the SPU NOTE The LEDs on the core I O and on the power supplies will remain lit for several seconds after ...

Страница 142: ...Chapter Shutting Down the SPU Shutting Down the SPU 2 ...

Страница 143: ...n CO Return to console mode SL Display SPU status log DC Default configuration SO Security options access control DI Disconnect remote or LAN console SS System Processor status DR Disable remote or LAN console TC System reset through INIT signal ER Enable remote or LAN console TE Send a message to other terminals HE Display the available commands VFP Activates alert log display IT Modify GSP inact...

Страница 144: ...and try again 4 Use ctrl b to re login to GSP or the cu command from the internal port 5 Re enter the GSP he command to verify the firmware revision number has changed to the version you have updated NOTE If you do the update from the GSP internal port following the last message above you need to exit the cu command and re issue the cu command in order to continue using the GSP from the internal p...

Страница 145: ...the hooked tabs go over the extended pins inside the chassis This acts like a hinge for the cover 5 Push the top of the cover plate towards the SPU until it is flush with the chassis and fully seated 6 Tighten the single captive mounting screw To view the video click here Once you have completed the addition of the disk drive you must perform the Hot swap procedure Hot Swap Software Procedure NOTE...

Страница 146: ...root dev vgroot Step 9 Extend the mirrors onto the disk you ve added For example lvextend m 1 LV name dev vgroot root dev dsk cXtXdX Step 10 Specify that logical volume be used as the root logical volume for example lvln r dev vgroot root At this point you will need to create a file system on the disk Refer to your HP UX system administration documentation Hot Swap Procedure for Unattached Physica...

Страница 147: ...tep 8 Create the root logical volume You must specify contiguous extents C y with bad block relocation disabled r n For example lvcreate C y r n root dev vgroot Step 9 Attach the new disk drive to the active volume group with the vgchange command vgchange a y volume group name For example vgchange a y dev vg00 Step 10 After running the mkboot command do an lvlnboot R to link the added disk drive i...

Страница 148: ...Adding a Disk Drive to an HP UX System 146 ...

Страница 149: ...witch click here 2 Remove the front bezel To view the video of the bezel click here 3 Remove the EMI shield To view the video of the EMI shield click here 4 Remove the power supply slot cover in the desired position by loosening the two captive screws at the top edge of the cover then pull it away from the SPU 5 Align the power supply with the selected empty slot in the front of the SPU 6 Slide th...

Страница 150: ...ghten the two mounting screws on the bottom 13 Replace the front bezel by aligning it over the front panel and front of the chassis and snapping it to the bezel retainer clips along the sides of the chassis To view the video click here Once the system is re assembled be sure there are no errors on the front panel or system console Be sure the system is ready for customer use Power Supply Power Swi...

Страница 151: ...ations The following will help optimize air flow cooling within the system Always install memory carriers in the sequence 0 1 2 than 3 For example if you have only two memory carriers make sure they are installed as carrier 0 and carrier 1 Install DIMMs into the carriers in the following slot order 0a b 1a b 2a b 3a b NOTE The most important rule is that DIMMs of the same type are distributed even...

Страница 152: ...ve the Front Bezel a Grasp the front bezel on each side b Pull the front bezel away from the cabinet Step 3 Extend the SPU out the Back of the Cabinet CAUTION Be aware of the cables at the back of the SPU while moving the SPU in or out of the cabinet To extend the SPU out the back of the cabinet a Remove the four two on each side retainer screws holding the bezel flange to the cabinet vertical pos...

Страница 153: ...fle will create air flow problems and possibly shorten the life of the internal components Hewlett Packard does not recommend the system be powered on with the air baffles removed Also operation of the system without the top cover and air baffle in place can make the system susceptible to EMI problems To remove the back air baffle from the a Loosen the two captive mounting screws at the support br...

Страница 154: ...back of the SPU Memory carriers are installed from slot 0 through slot 3 slot 0 is the right most slot facing the back of the SPU To replace the memory carrier in the SPU a While holding the memory carrier by the extended insertion extractor levers align the memory carrier with the appropriate slot card guides on the system board b Carefully lower the memory carrier into the card guides until the ...

Страница 155: ...e rail slide locks one on each side to release the rail locks while gently pushing the SPU forward b Carefully insert the SPU all the way into the cabinet until the front of the SPU sticks out approximately 2 to 4 inches NOTE It is recommended that you push the SPU from the back of the cabinet This allows you to monitor the cable movement to avoid snags and tangles with other SPUs or cables c Alig...

Страница 156: ...Carefully insert the A C power cords 3 into the line filter receptacles at the back of the SPU NOTE Be sure to plug all three power cords into the back of the SPU Also be sure the cabinet PDU is plugged into an appropriate wall outlet d Put the power switch in the on position At this time you will hear the cooling fans coming up to speed and being synchronized This creates a high pitched squeak fo...

Страница 157: ...wo on the right slots 1 through 6 and two on the left slots 7 through 12 CAUTION If you are installing the A3783A 10 100Base TX LAN card do not connect any type of MAU transceiver to the AUI connector while the system is powered up Doing so will cause power to be shut off to the I O slot and will generate a High Priority Machine Check HPMC error If you are going to connect a MAU transceiver to thi...

Страница 158: ...3 Extend the SPU out the Back of the System CAUTION Be aware of the cables at the back of the SPU while moving the SPU in or out of the cabinet To extend the SPU out the back of the cabinet a Remove the four two on each side retainer screws holding the bezel flange to the cabinet vertical post b Carefully extend the SPU out the front of the cabinet approximately 2 to 4 inches c Loosen the six thre...

Страница 159: ...PCI cards The separators also have tabs which facilitate removing the cards a Remove the metal slot cover if present at the rear of the SPU b Align the PCI card with the appropriate slot c Insert the PCI card into the card cage between the separator extractor cards d Press firmly on the PCI card to be sure it is fully seated Step 6 Replace the PCI Cover Plate a Swing the I O slot cover closed b Ti...

Страница 160: ...nected peripherals are on with no errors or faults indicated b Be sure the SPU power switch is in the standby 0 position CAUTION When the power cords are connected to the SPU there will be power present inside the SPU chassis even with the power switch in the standby position c Carefully insert the A C power cords 3 into the line filter receptacles at the back of the SPU NOTE Be sure to plug all t...

Страница 161: ...xPCI 2 0 5 0 2xPCI 3 0 4 0 4xPCI 4 0 8 0 4xPCI 5 0 10 0 4xPCI 6 0 2 0 4xPCI 7 1 12 0 4xPCI 8 1 10 0 4xPCI 9 1 4 0 4xPCI 10 1 2 0 4xPCI 11 1 8 0 4xPCI 12 1 0 0 4xPCI Core I O 10 100 base T 0 0 0 0 Core I O ext SCSI 0 0 1 0 Core I O Int SCSI 0 0 2 0 Core I O GSP 0 0 4 0 Core I O UPS 0 0 5 0 ...

Страница 162: ...Add I O Cards 160 ...

Отзывы: