
2-1
Installation
Initial Inspection
2
Installation
Initial Inspection
WA R N I N G
TO AVOID HAZARDOUS ELECTRICAL SHOCK, DO NOT
PERFORM ELECTRICAL TESTS WHEN THERE ARE SIGNS OF
SHIPPING DAMAGE TO ANY PORTION OF THE OUTER
ENCLOSURE (COVERS, PANELS, METERS).
Inspect the shipping container for damage. If the shipping container or
cushioning material is damaged, it should be kept until the contents of
the shipment have been checked for completeness and the instrument
has been checked both mechanically and electrically. Procedures for
checking electrical operation are given in the Calibration manual. If the
contents of the shipment are incomplete, if there is mechanical damage
or defect, notify the nearest Hewlett-Packard Office. If the instrument
does not pass the electrical performance tests given in the Calibration
manual, notify the nearest Hewlett-Packard office. If the shipping
container is also damaged, or the cushioning material shows signs of
stress, notify the carrier as well as the nearest Hewlett-Packard office.
Keep the shipping materials for the carrier’s inspection. The Hewlett-
Packard office will arrange for repair or replacement without waiting for
claim settlement.
Содержание 37717C
Страница 2: ...HP 37717C Communications Performance Analyzer Calibration Manual ...
Страница 5: ...2 ...
Страница 21: ...xviii Contents ...
Страница 102: ...2 13 Installation Connecting to the Network Location of Laser Apertures on Options 130 and 131 ...
Страница 109: ...2 20 Installation Additional Precautions for Service Engineers ...
Страница 125: ...3 16 Performance Tests PDH Transmitter Output UKK USB UKJ USA Figure 3 7 8 Mb s Isolated Negative Pulse ...
Страница 312: ...3 203 Performance Tests Trigger Output Option UKZ Figure 3 57 Monitor Input Test Setup ...
Страница 375: ...3 266 Performance Tests Performance Test Record ...
Страница 379: ...4 4 Installation Current Previous Terminology ...
Страница 392: ...B 9 Appendix B Fitting Calibrating Testing New Modules Typical Jitter Transmit Spectrum ...
Страница 393: ...B 10 Appendix B Fitting Calibrating Testing New Modules ...