Chapter 15. Optional System Components
172
Hospira GemStar System Operating Manual
250 mL Lockbox
(List 13024-01)
1
Open the lockbox (
A
).
2
Flip the top door up (
B
).
3
Align the pump with the lockbox
(
C
).
4
Slide the pump down into the
lockbox until fully seated.
5
Flip the top door down.
6
Connect the pump set to the bag
and prime.
7
Place the flexible container inside
the lockbox with the
administrative port down (
D
).
8
Hang the bag on the hook inside
the lockbox (
E
).
9
Ensure slide clamp is open prior to
inserting cassette.
10
Load the cassette (
F
).
CAUTION: Ensure all four
cassette latches are clearly
visible after the cassette is
installed. Refer to
11
Ensure the tubing will not be
pinched when closing the lockbox.
A
B
C
E
D
d
Note: Ensure the tubing is in the
tubing guide (at the distal end).
F
Содержание GemStar Series
Страница 9: ...Notes viii Hospira GemStar System Operating Manual ...
Страница 11: ...Chapter 1 Introduction 2 Hospira GemStar System Operating Manual GemStar Pump Layout Shown approximate size ...
Страница 27: ...Notes 18 Hospira GemStar System Operating Manual ...
Страница 67: ...Notes 58 Hospira GemStar System Operating Manual ...
Страница 77: ...Notes 68 Hospira GemStar System Operating Manual ...
Страница 87: ...Notes 78 Hospira GemStar System Operating Manual ...
Страница 95: ...Notes 86 Hospira GemStar System Operating Manual ...
Страница 103: ...Notes 94 Hospira GemStar System Operating Manual ...
Страница 165: ...Notes 156 Hospira GemStar System Operating Manual ...
Страница 173: ...Chapter 14 Operation Test 164 Hospira GemStar System Operating Manual ...
Страница 175: ...Notes 166 Hospira GemStar System Operating Manual ...
Страница 187: ...Chapter 15 Optional System Components 178 Hospira GemStar System Operating Manual A B D C I H G F E J N M K L ...
Страница 193: ...Notes 184 Hospira GemStar System Operating Manual ...
Страница 221: ...Notes 212 Hospira GemStar System Operating Manual ...