5-10
6
Remove the shutoff valves.(MV9/MV29)
(Refer to
“5.5 Shutoff valve (MV9/MV29) Replacement”)
7
Remove the 4 fastening screws of the heating unit.
Remove the head base rear cover. (14 screws)
8
Remove the two connectors and remove the heating unit.
9
Prepare the new heating unit and put O-ring 1.7 in the joint area
of the ink-supply tube (E).
Perform the assembly after dipping the O-ring in makeup, and
confirm that the O-ring does not jump out of the hole.
10
Attach the head cover and the heater cover.
Fastening screw
Head base rear cover
MV9, MV29
Fastening screw
Heating unit
Содержание UX Twin Nozzle
Страница 1: ...Service Manual HITACHI Printer UX Twin Nozzle Model Revision February 2017 Version A ...
Страница 106: ...3 30 Circuit diagram of EZJ127A board ...
Страница 123: ...3 47 Circuit diagram of EZJ129 board ...
Страница 131: ...3 55 3 3 20 Electrical Connection Diagram ...
Страница 151: ...4 17 7 Reset the time of the replaced solenoid to 0 on the Parts usage time management screen ...
Страница 352: ...7 1 7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram ...
Страница 354: ...7 3 7 3 Electrical Connection Diagram Electrical Connection Diagram ...
Страница 355: ...7 4 7 4 Dimensions around charge electrode and deflection electrode Nozzle diameter 65μm Nozzle 2 side Nozzle 1 side ...