![Hitachi UX Twin Nozzle Скачать руководство пользователя страница 31](http://html.mh-extra.com/html/hitachi/ux-twin-nozzle/ux-twin-nozzle_service-manual_143808031.webp)
2-9
3 Measure TP12 of the EZJ125 board and TP3 of the EZJ134 board with an
oscilloscope and make sure it is within the range of DC250V ± 15V.
When confirmation is completed, press Abort and you can stop work before 3 minutes elapse.
Charge voltage
[Waveform of charge voltage confirmation]
← GND level
For the position of the
board and test pins, refer to “3.3.5 EZJ125 board” and “3.3.6 EZJ134 board”.
Содержание UX Twin Nozzle
Страница 1: ...Service Manual HITACHI Printer UX Twin Nozzle Model Revision February 2017 Version A ...
Страница 106: ...3 30 Circuit diagram of EZJ127A board ...
Страница 123: ...3 47 Circuit diagram of EZJ129 board ...
Страница 131: ...3 55 3 3 20 Electrical Connection Diagram ...
Страница 151: ...4 17 7 Reset the time of the replaced solenoid to 0 on the Parts usage time management screen ...
Страница 352: ...7 1 7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram ...
Страница 354: ...7 3 7 3 Electrical Connection Diagram Electrical Connection Diagram ...
Страница 355: ...7 4 7 4 Dimensions around charge electrode and deflection electrode Nozzle diameter 65μm Nozzle 2 side Nozzle 1 side ...