4-38
5 Clean the portion stained with ink and then install the new pump head in reverse
order of the procedures above.
[Caution] Make sure to use new O-rings. (2 pieces)
Be careful not to cause the O-ring to fall off or pinched.
Refer to the figures below for identifications.
6
Reset the pump time to "0" on the
“Parts usage time management” screen.
Recovery pump head
4 positions
Содержание UX Twin Nozzle
Страница 1: ...Service Manual HITACHI Printer UX Twin Nozzle Model Revision February 2017 Version A ...
Страница 106: ...3 30 Circuit diagram of EZJ127A board ...
Страница 123: ...3 47 Circuit diagram of EZJ129 board ...
Страница 131: ...3 55 3 3 20 Electrical Connection Diagram ...
Страница 151: ...4 17 7 Reset the time of the replaced solenoid to 0 on the Parts usage time management screen ...
Страница 352: ...7 1 7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram ...
Страница 354: ...7 3 7 3 Electrical Connection Diagram Electrical Connection Diagram ...
Страница 355: ...7 4 7 4 Dimensions around charge electrode and deflection electrode Nozzle diameter 65μm Nozzle 2 side Nozzle 1 side ...