75
Step 2
Mount the Device on the guide rails or the shelf. Hold the bottom and the handles of
the Device when mounting the device.
Figure 4-4 Mounting into the rack
(1) Handle
(2) Rack
(3) Guide rail
The maximum weight of the Hitachi WAN Accelerator is 25 kg. The Device must be
installed and carried by at least two people. Installing or carrying a Device with too few
people could result in the device being dropped or falling, possibly leading to injury.
When moving a Device, do not hold the handle of the fan unit or power supply unit. The
handle might come off, resulting in the device falling and possibly causing injury.
Moreover, the fan unit or power supply unit might become damaged, resulting in a fire
or electric shock.
NOTE
To install a Device in an elevated location, we recommend that you use a hand lifter or
equivalent device.
(1)
(2)
(3)
Содержание GX1000-SMC013X
Страница 94: ...94 5 Configuration Guide 5 1 Base Software Configuration Guide ...
Страница 105: ...105 7 Access Lists 7 1 Access lists ...
Страница 153: ...153 8 Policy Based Switching 8 1 Policy based switching ...
Страница 165: ...165 9 Policy Based Routing 9 1 Policy based routing ...
Страница 177: ...177 Figure 10 1 Overview of mode transitions ...
Страница 188: ...188 14 Configuration Command Reference 14 1 Reading the configuration command reference 14 2 SNMP 14 3 SP functionality ...
Страница 208: ...208 16 Message and Log Reference 16 1 Operation messages and logs 16 2 Device Failure and Event Information ...
Страница 213: ...213 17 MIB Reference 17 1 Private MIBs 17 2 Supported MIB Traps ...
Страница 224: ...224 19 1 Starting the device For details see 5 1 Login procedures in the Base Software Configuration Guide ...
Страница 229: ...229 H W BOOT 11 44 MISC 1 0 SPCT 0 34 10 The updating of the SP files is finished ...
Страница 448: ...448 27 Notes This chapter provides notes on using the WAN acceleration functionality 27 1 Note ...
Страница 451: ...451 28 Additional Information ...