
-54-
Model G0841 (Mfd. Since 06/18)
Elevation Screw Bearings
Lube Type ............. T26419 or NLGI#2 Equivalent
Lube Amount ...........................................1 Pump
Lube Frequency ................................1200 Hours
Item(s) Needed:
Qty
Grease Gun ....................................................... 1
Shop Rags ......................................... As Needed
The elevation system screw bearings require
lubrication every 1200 hours of operation to
ensure smooth movement of the headstock. The
elevation screw bearings are lubricated by grease
fittings (see
Figure 80). Wipe grease fittings clean
and use a grease gun to pump a small amount of
grease into fittings, then wipe away any excess
grease with a rag.
Figure 80. Location of elevation screw bearing
grease fitting.
Elevation Screw
Bearing Grease
Fitting (1 of 4)
elevation screw bearings
Table Roller Bearings
Lube Type ............. T26419 or NLGI#2 Equivalent
Lube Amount ...........................................1 Pump
Lube Frequency ................................1500 Hours
Item(s) Needed:
Qty
Grease Gun ....................................................... 1
Shop Rags ......................................... As Needed
The table roller bearings require lubrication every
1500 hours of operation to ensure material rolls
smoothly across the planer table. The table roller
bearings are lubricated by grease fittings (see
Figure 82). Wipe grease fittings clean and use
a grease gun to pump a small amount of grease
into fittings, then wipe away any excess grease
with a rag.
Figure 82. Location of idler roller bearing grease
fitting (1 of 2).
Idler Roller
Bearing Grease
Fitting (1 of 2)
table roller bearings
Elevation Leadscrews
Lube Type ............ T26419 or NLGI#2 Equivalent
Lube Amount ..................................Medium Coat
Lube Frequency ................................1200 Hours
Item(s) Needed:
Qty
Grease Brush .................................................... 1
Stiff Brush .......................................................... 1
Mineral Spirits .................................... As Needed
Shop Rags ......................................... As Needed
The leadscrews (see
Figure 81) raise and lower
the headstock. To ensure smooth movement and
proper alignment of the headstock, clean lead-
screws every 1200 hours of operation with mineral
spirits, stiff brush, and shop rags, and allow chain
to dry, then moderately grease the leadscrews.
To access the leadscrews, raise the headstock to
at least 7" and lift the leadscrew boots, as shown
in
Figure 81. Re-attach boots when done.
elevation leadscrews
Figure 81. Boot lifted to expose leadscrew.
Leadscrew
Boot (1of 4)
Leadscrew
(1of 4)
Содержание G0841
Страница 84: ......