If the outer diameter of the heating pipe is 20mm and thickness is 2mm, then the minimum flow for the
heating pipe is:
It can be see that the arranged piping system for the bathroom does not meet the technical
requirement and must be used in common for the master room.
7.2.4 Arrangement Design of the Underfloor System for the Master and Bath Rooms
According to the calculation results, the total heat load for the master and bath rooms is 3196W, heat
dissipation per unit area is 82W/m
2
, tube spacing of the heating pipe is 300mm, and heat loss is 25.4
W/m
2
, then the total heat loss is:
3196+1016=4212W
According to the formula Q= C
ρGΔT, the flow rate is
Loop quantity is 0.3622/0.18=2.012 and the round-off number is 2.
7.2.5 Check
A. Check for the flow rate
Floor rate of each loop is within 0.25~0.5m/s and the system can run stably.
B. Check for the tube length
When the average tube spacing is 30mm, the required length of the heating pipe per square meter is
3.5m, length of total coils is 3.5×40=140 and length for each loop is 140/2=70.
It can be seen that the length for each loop is less than 120m and there it meets the design
requirement.
C. Check for the ground average temperature
tp=tn+9.82×(qx/100) 0.969=20+9.82×(82/100) 0.969=28°C
Upper Limits and Average Floor Temperature
Average Floor Temperature
Area
Average Temperature
Maximum Temperature
Long-term Dwelling Area
24~26
28
Short-term Dwelling Area
28~30
32
Nobody Area
35~40
42
7.3 Model Selection
Heat demand for a single layer: 3196W
Heat loss for a single layer: 1016W
Total heat load for a single layer: 4212W
Total heat load of the building: 8424W
Capacity of the main unit should be larger than 8424W, so we can select:
GRS-CQ10Pd/NhG-K OR
GRS-CQ10Pd/NhG-M
Содержание VERSATI III Series
Страница 1: ...VERSATI Ⅲ Air To Water Heat Pump ...
Страница 5: ...Engineering Data ENGINEERING DATA ...
Страница 10: ...Engineering Data 1 4 Operating Principle 1 4 1 Schematic Diagram ...
Страница 22: ...Design and Selection DESIGN SELECTION ...
Страница 33: ...Unit Control UNIT CONTROL ...
Страница 72: ...Unit Control ...
Страница 76: ...Unit Control 3 3 2 Setting of Main Functions 1 Set mode and temperature ...
Страница 77: ...Unit Control 2 Click Func at the left lower corner in device operation interface to enter advanced settings ...
Страница 79: ...Unit Control 3 3 3 2 Help Click Help and view the operation instructions of the APP ...
Страница 80: ...Unit Control ...
Страница 81: ...Unit Control 3 3 3 3 Feedback Click Feedback to submit feedback ...
Страница 82: ...Installation UNIT INSTALLATION ...
Страница 113: ...Test Operation Troubleshooting Maintenance TEST OPERATION TROUBLESHOOTING MAINTENANCE ...
Страница 117: ...Test Operation Troubleshooting Maintenance 3 Flow Chart of Troubleshooting 3 1 Comp High pressure Protection E1 ...
Страница 118: ...Test Operation Troubleshooting Maintenance 3 2 Comp Low pressure Protection E3 ...
Страница 119: ...Test Operation Troubleshooting Maintenance 3 3 Comp Discharge Temp Protection E4 ...
Страница 120: ...Test Operation Troubleshooting Maintenance 3 4 Overload Protection of Compressor or Driver Error ...
Страница 121: ...Test Operation Troubleshooting Maintenance 3 5 DC Fan Error EF 3 6 Temperature Sensor Error ...
Страница 122: ...Test Operation Troubleshooting Maintenance 3 7 Communication Malfunction E6 ...
Страница 123: ...Test Operation Troubleshooting Maintenance 3 8 Capacity Switch Error Code C5 ...
Страница 125: ...Test Operation Troubleshooting Maintenance IPM or PFC Over temperature Protection Code P8 ...
Страница 127: ...Test Operation Troubleshooting Maintenance ...
Страница 135: ...Test Operation Troubleshooting Maintenance ...