![Gree VERSATI III Series Скачать руководство пользователя страница 96](http://html1.mh-extra.com/html/gree/versati-iii-series/versati-iii-series_service-manual_2260168096.webp)
Installation
4.7 Installation of Water Tank
4.7.1 Installation measure
The insulated water tank should be installed and keep levelly within 5m and vertically within 3m from
the indoor unit. It can be installed in the room.
Standing water tank must be installed vertically with the bottom on the ground, never suspended.
Installation place must be firm enough and the water tank should be fixed on the wall with bolts to avoid
vibration, as shown in the following figure. Weight capacity of water tank during installation should also
be considered.
The minimum clearance from the water tank to combustible surface must be 500mm.
There should be water pipe, hot water joint and floor drain near the water tank in favor of water
replenishment, hot water supply and drainage of water tank.
Connection of inlet/outlet waterway: Connect the safety check valve attached with the unit (with the
arrow on it pointing at the water tank) with the water inlet of water tank with PPR pipe according to the
following figure, sealing with unsintered tape. The other end of the safety check valve should connect
with tap water joint. Connect the hot water pipe and water outlet of water tank with PPR pipe.
Note
For safe use of water, water outlet/inlet of water tank must connect with a certain length of PPR
pipe ,L≥70×R2(cm, R is inside radius of the pipe). Moreover, heat preservation should be conducted and
metal pipe cannot be used. For the first use, water tank must be full of wa ter before the power is on.
4.7.2 Outline dimension and parameter of water tank
The insulated water tank should be installed and keep levelly within 5m and vertically within 3m from
the indoor unit. It can be installed in the room.
Содержание VERSATI III Series
Страница 1: ...VERSATI Ⅲ Air To Water Heat Pump ...
Страница 5: ...Engineering Data ENGINEERING DATA ...
Страница 10: ...Engineering Data 1 4 Operating Principle 1 4 1 Schematic Diagram ...
Страница 22: ...Design and Selection DESIGN SELECTION ...
Страница 33: ...Unit Control UNIT CONTROL ...
Страница 72: ...Unit Control ...
Страница 76: ...Unit Control 3 3 2 Setting of Main Functions 1 Set mode and temperature ...
Страница 77: ...Unit Control 2 Click Func at the left lower corner in device operation interface to enter advanced settings ...
Страница 79: ...Unit Control 3 3 3 2 Help Click Help and view the operation instructions of the APP ...
Страница 80: ...Unit Control ...
Страница 81: ...Unit Control 3 3 3 3 Feedback Click Feedback to submit feedback ...
Страница 82: ...Installation UNIT INSTALLATION ...
Страница 113: ...Test Operation Troubleshooting Maintenance TEST OPERATION TROUBLESHOOTING MAINTENANCE ...
Страница 117: ...Test Operation Troubleshooting Maintenance 3 Flow Chart of Troubleshooting 3 1 Comp High pressure Protection E1 ...
Страница 118: ...Test Operation Troubleshooting Maintenance 3 2 Comp Low pressure Protection E3 ...
Страница 119: ...Test Operation Troubleshooting Maintenance 3 3 Comp Discharge Temp Protection E4 ...
Страница 120: ...Test Operation Troubleshooting Maintenance 3 4 Overload Protection of Compressor or Driver Error ...
Страница 121: ...Test Operation Troubleshooting Maintenance 3 5 DC Fan Error EF 3 6 Temperature Sensor Error ...
Страница 122: ...Test Operation Troubleshooting Maintenance 3 7 Communication Malfunction E6 ...
Страница 123: ...Test Operation Troubleshooting Maintenance 3 8 Capacity Switch Error Code C5 ...
Страница 125: ...Test Operation Troubleshooting Maintenance IPM or PFC Over temperature Protection Code P8 ...
Страница 127: ...Test Operation Troubleshooting Maintenance ...
Страница 135: ...Test Operation Troubleshooting Maintenance ...