Unit Control
3.2.4.13 Gate-Ctrl.
[Operation Instructions]
★
At the commissioning parameter setting page, by touching ―
Gate-Ctrl.
‖, the control panel will access
to the corresponding setting page.
[Notes]
●When ―
Gate-Ctrl.
‖ has been activated; the display panel will detect the card state. When the card has
inserted, the unit will run normally. When the card is drawn out, the controller will turn off the unit at
once and back to the homepage. In this case, all touching operation become ineffective, and a prompt
dialog box will pop up. The unit will resume normal operation until the card has inserted back and the
ON/OFF status of the control panel will resume to that before the card is drawn out.
●This setting will be memorized upon power failure.
3.2.4.14 Current Limit
[Operation Instructions]
★
1. At the commissioning parameter setting page, by touching ―
Current limit
‖, it can be set to ―
On
‖ or
―
Off
‖.
★
2. When it is set to ―
On
‖, it is able to set the limited current value.
★
3. After that, this setting will be saved by touching the ―
Save
‖ icon,
[Notes]
● This setting will be memorized upon power failure.
3.2.4.15 Address
[Operation Instructions]
★
At the commissioning parameter setting page, by tou
ching ―
Current limit
‖, it can be set the address.
[Notes]
:
● It is used to set the address of the control panel for being integrated to the centralized control system.
● This setting will be memorized upon power failure.
● The setting range is 1~125 and 127~253.
● The defaulted address is 1 upon first power-on.
3.2.4.16 Refrigerant Recovery
[Operation Instructions]
★
At the commissioning parameter setting page, by touching ―
Refri. recovery
‖, it will access to the
refrigerant recovery page.
★
When ―
Refri. recovery
‖ is set to ―
On
‖, the control panel will go back to the home page. At this time,
any touch operation except ON/OFF will get no response, with a prompt dialog box popping up,
saying ―
The refrigerant recovery is running!
‖ By touching ON/OFF, refrigerant recovery will quit.
Содержание VERSATI III Series
Страница 1: ...VERSATI Ⅲ Air To Water Heat Pump ...
Страница 5: ...Engineering Data ENGINEERING DATA ...
Страница 10: ...Engineering Data 1 4 Operating Principle 1 4 1 Schematic Diagram ...
Страница 22: ...Design and Selection DESIGN SELECTION ...
Страница 33: ...Unit Control UNIT CONTROL ...
Страница 72: ...Unit Control ...
Страница 76: ...Unit Control 3 3 2 Setting of Main Functions 1 Set mode and temperature ...
Страница 77: ...Unit Control 2 Click Func at the left lower corner in device operation interface to enter advanced settings ...
Страница 79: ...Unit Control 3 3 3 2 Help Click Help and view the operation instructions of the APP ...
Страница 80: ...Unit Control ...
Страница 81: ...Unit Control 3 3 3 3 Feedback Click Feedback to submit feedback ...
Страница 82: ...Installation UNIT INSTALLATION ...
Страница 113: ...Test Operation Troubleshooting Maintenance TEST OPERATION TROUBLESHOOTING MAINTENANCE ...
Страница 117: ...Test Operation Troubleshooting Maintenance 3 Flow Chart of Troubleshooting 3 1 Comp High pressure Protection E1 ...
Страница 118: ...Test Operation Troubleshooting Maintenance 3 2 Comp Low pressure Protection E3 ...
Страница 119: ...Test Operation Troubleshooting Maintenance 3 3 Comp Discharge Temp Protection E4 ...
Страница 120: ...Test Operation Troubleshooting Maintenance 3 4 Overload Protection of Compressor or Driver Error ...
Страница 121: ...Test Operation Troubleshooting Maintenance 3 5 DC Fan Error EF 3 6 Temperature Sensor Error ...
Страница 122: ...Test Operation Troubleshooting Maintenance 3 7 Communication Malfunction E6 ...
Страница 123: ...Test Operation Troubleshooting Maintenance 3 8 Capacity Switch Error Code C5 ...
Страница 125: ...Test Operation Troubleshooting Maintenance IPM or PFC Over temperature Protection Code P8 ...
Страница 127: ...Test Operation Troubleshooting Maintenance ...
Страница 135: ...Test Operation Troubleshooting Maintenance ...