![GLI P63 Скачать руководство пользователя страница 22](http://html.mh-extra.com/html/gli/p63/p63_operating-instructions-manual_2231741022.webp)
PART TWO - INSTALLATION
SECTION 2 - MECHANICAL REQUIREMENTS
Rev. 7-1201
Model P63 pH Analyzer
21
FIGURE 2-2 Analyzer Installation Dimension Details
2.3 Conduit Hole
Requirements
☞
Recommendation:
Run all wiring to the analyzer in 1/2-
inch, grounded metal conduits. If using only shielded ca-
bles, appropriate strain reliefs or cable grips are required.
(GLI sells accessory cable grips, part number 3H1091, and
watertight locknuts, part number 3H1230, for cable entries.)
Seal unused cable entry holes with appropriate plugs.
NOTE:
Use NEMA 4 rated fittings and plugs to maintain the
watertight integrity of the NEMA 4X enclosure.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com