
31
If the Use Settings check box is turned off in Gerber software, the rule set
in the ODYSSEY XP control panel is used. Rule set selection in the
ODYSSEY XP can ignore the rule set included with the job. This
condition is used for spool files, which can have embedded rules.
Selection is made on the Operational Setup menu, System, Rules, Select
Rule Usage menu.
♦
If set to
When Received
, Gerber software overrides the rule set in the
plotter for this job.
♦
If set to
Never
, the plotter ignores embedded rules and permits an
operator to use a different rule set for the job.
Remember, control panel setting changes:
♦
are retained even after the power has been shut off.
♦
apply only to the currently selected material.
♦
are overridden by Gerber software during the job unless the plotter
Rules Setting is set to
Never
or turned off from the plot program.
Note: Rule sets are part of the job sent from Gerber software. They remain in
effect for that job unless you modify the job in GAPlot32/GSPPlot. Settings
made at the plotter are associated with the current material selected. If settings
are modified at the plotter during a job, they are stored in the plotter even after
the job ends.
To select which set of rules is used
1
Select the Operational Setup menu by pressing F3 while holding down
ENTER.
2
Press F3, System.
3
Press F4, Rules.
OPERATIONAL SETUP
Settings
System
Misc.
ENTER for Main Menu
F3
SYSTEM PARAMETERS
Comm.
Version
HPGL Units
Rules
ENTER for Main Menu
F4
Содержание ODYSSEY XP
Страница 1: ...Owner s Guide ...
Страница 4: ......