![GE MOTOR MANAGEMENT RELAY 469 Скачать руководство пользователя страница 241](http://html.mh-extra.com/html/ge/motor-management-relay-469/motor-management-relay-469_instruction-manual_131868241.webp)
GE Power Management
469 Motor Management Relay
7-1
7 TESTING
7.1 OVERVIEW
7
7 TESTING 7.1 OVERVIEW
7.1.1 TEST SETUP
The purpose of this testing description is to demonstrate the procedures necessary to perform a complete
functional test of all the 469 hardware while also testing firmware/hardware interaction in the process. Since
the 469 is packaged in a drawout case, a demo case (metal carry case in which an 469 may be mounted) may
be useful for creating a portable test set. Testing of the relay during commissioning using a primary injection
test set will ensure that CTs and wiring are correct and complete.
Figure 7–1: SECONDARY INJECTION TEST SETUP
Содержание MOTOR MANAGEMENT RELAY 469
Страница 2: ......
Страница 4: ......
Страница 12: ......
Страница 22: ......
Страница 50: ......
Страница 142: ......
Страница 240: ......
Страница 254: ......
Страница 272: ......
Страница 286: ......
Страница 290: ......
Страница 294: ......
Страница 298: ......
Страница 300: ......
Страница 302: ......