GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5
VIVID E9 S
ERVICE
M
ANUAL
4 - 44
Section 4-3 - Functional checks
4-3-7
Probe/Connectors Check
CAUTION
TAKE THE FOLLOWING PRECAUTIONS WITH THE PROBE CABLES:
- KEEP AWAY FROM THE WHEELS
- DO NOT BEND
- DO NOT CROSS CABLES BETWEEN PROBES
Table 4-5
Probe and Connectors Checks
Step
Task
Expected Result(s)
1.
Press
Probe
on the Operator Panel.
A list of the connected probes will pop up on the screen.
2.
If not already selected. Use the trackball to select the
desired probe.
An application menu for the desired probe is listed on
the screen.
3.
Trackball to the desired application
Press
Select
to launch the application.
To change application without changing the current
probe, press
Appl.
on the Operator Panel.
The selected application starts.
4.
Verify no missing channels
All channels are functioning.
5.
Verify there's no EMI/RFI or artifacts specific to the
probe.
No EMI/RFI or artifacts.
6.
Test the probe in each active connector slot.,
see
3-7-6 "Connecting Probes" on page 3-24
It will display pictorial data each time
7.
Do a leakage test on the probe, see
"Electrical Safety Tests" on page 10-20
It passes the test.
8.
Repeat this procedure for all available probes.
Содержание GA000100
Страница 1: ...GE Healthcare OPERATING DOCUMENTATION VIVID E9 Service Manual Part Number GA091568 Revision 5 ...
Страница 2: ......
Страница 11: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL ix ZH CN KO ...
Страница 34: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL xxxii ...
Страница 800: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL Index 12 ...
Страница 801: ......