GE H
EALTHCARE
D
IRECTION
GA091568, R
EVISION
5
VIVID E9 S
ERVICE
M
ANUAL
Chapter 4 - General procedures and Functional checks
4 - 9
4-2-2-1
Complete Power Down
1.) Before Power Down, lock the Top Console in its lower, locked position. This is required if you are
going to move or transport the VIVID E9 to ensure maximum stability.
NOTE:
For service purposes, you may want to move the Top Console after Power Down. If you leave
the Top Console in unlocked position, it will be sensed during Power Down, and the brakes that
usually stabilize the position of the Top Console, will be released so you can move the Top
Console in the XY directions.
2.) Press once on the
On/Off
key on the Operator Panel to display the
System - Exit
menu.
3.) Select Shutdown to do a complete power down of the unit.
The Back End Processor will first turn off the scanner activity and print the message “Please wait -
Shutdown in progress” in the LCD display on the Operator Panel.
Next, it starts to shut down itself. The time to turn down the unit, including the Back End Processor,
may vary from 10 seconds up to approximately 1 minute.
The last thing that shuts down, is the light on the Operator Panel, indicating that you can continue
with the next step.
Figure 4-6 Press once on the key with the green light
Figure 4-7 Select Shutdown
Содержание GA000100
Страница 1: ...GE Healthcare OPERATING DOCUMENTATION VIVID E9 Service Manual Part Number GA091568 Revision 5 ...
Страница 2: ......
Страница 11: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL ix ZH CN KO ...
Страница 34: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL xxxii ...
Страница 800: ...GE HEALTHCARE DIRECTION GA091568 REVISION 5 VIVID E9 SERVICE MANUAL Index 12 ...
Страница 801: ......