U41261-J-Z816-4-76
19
2.3 Preparing for Operation
2.3
Preparing for Operation
This section covers the following topics:
l
l
l
l
l
l
Installing the Enhanced Support Facility package
l
Enabling or disabling input of the Break signal
l
2.3.1
Notes on installation
• Rack installation notes
Follow these procedures to ensure that safety requirements are addressed when this
product is installed in a rack.
l
The PRIMEPOWER650 rack-mount type (8U) server is installed in a closed or
multi-unit rack assembly. The ambient operating temperature inside the rack may
be greater than the room temperature. Make sure that the PRIMEPOWER650 rack-
mount type (8U) server is installed in an environment that does not exceed the
manufacturer's maximum rated ambient temperature.
- Adjust air conditioning and air circulation to prevent the internal rack ambient
temperature from exceeding the maximum operating temperature of this unit.
- Maximum internal operating temperature of this unit: 35
°
C (95
°
F).
Equipment damage
Observe the following precautions to prevent damage to the PRIMEPOWER650
rack-mount type (8U) server.
Содержание PRIMEPOWER650
Страница 1: ...Edition September 2004 PRIMEPOWER850 650 ...
Страница 22: ......
Страница 30: ......
Страница 81: ...U41261 J Z816 4 76 51 2 5 Configuring for the Fast Memory Mode ...
Страница 82: ......
Страница 154: ......
Страница 162: ......
Страница 172: ......
Страница 180: ......
Страница 192: ......
Страница 194: ......