Chapter 4 Installation and Wiring
PAGE 4-37
[Output Signals]
Outputs can be sourced (PNP) or sinked (NPN) depending on the polarity of the 24VDC input power.
REJECT
: Spindle Reject signal (Normally Open)
TOTAL REJECT
: Total Reject signal (Normally Open)
Output when the fastening result is a REJECT.
For a Multi-spindle system (Master): Indicates that one or more spindles have failed
achieving the fastening limits. This output remains active until the START signal or RESET
signal is input.
ACCEPT
: Spindle Accept signal (Normally Open)
TOTAL ACCEPT
: Total Accept signal (Normally Open)
Output when the fastening result is an ACCEPT.
For a Multi-spindle system (Master): Indicates that all of the spindles have achieved the
fastening limits. This output remains active until the START signal or RESET signal is input.
ABNORMAL
: Spindle System/Result Abnormal signal (Normally Open)
TOTAL ABNORMAL
: Total System/Result Abnormal signal (Normally Closed)
Output when an Abnormal condition occurs.
This signal indicates that the System has detected an internal fault and can no longer
proceed. The fault may be generated from a connected spindle during a self-check function.
Check the individual spindle status to identify which spindle is reporting the abnormal
condition. The spindle reporting an abnormal may be bypassed to resume normal operation.
However, the bypassed spindle will be ignored and not run while in bypass. An Abnormal
condition must be corrected before the System will resume normal operation. The RESET
signal clears the abnormal condition.
READY
: Spindle Input Enabled signal and ready to run (Normally Open)
TOTAL READY
: Total Input Enabled signal (Normally Open)
Output when the system is in the READY condition. Indicates system is ready to operate and
inputs are enabled. This signal is inactive (off) in the following conditions:
During the initialization process when power is turned on (for approx.. 5 sec.)
STOP condition
While fastening (when BUSY)
While resetting
Bypass condition
Abnormal condition
When a START or another REVERSE signal is input
During a CAL check
When operation of the system/spindle by an external input is impossible
BUSY
: Spindle in cycle (Operation) signal (Normally Open)
TOTAL BUSY
: Sequence in Operation signal (Normally Open)
Output after a START or REVERSE signal is received and active until the reverse or
fastening cycle is complete or until a RESET or STOP condition occurs.
For Multi System (Master Spindle): Output “ON” while the fastening sequence is in operation.
TOTAL BUSY signal turns “OFF when the STOP signal, RESET signal or ABNORMAL signal
is turned “ON” OR when the ACCEPT or REJECT signal is output after the fastening
sequence completion.
END
: (Fieldbus Only) Output when a fastening cycle is complete. Remains active until the START,
RESET or REVERSE signal is input.
DATA AVAILABLE
: Fastening Results Available signal (Normally Open)
Output “ON” when the fastening results are available to be collected via the AXIS LINK.
This signal turns “OFF” after data collection has completed and can be used to monitor that
the AFC3000 software is monitoring / collecting data (when AFC3000 Software is used)
Содержание AFC3000
Страница 1: ...AFC3000E HW 1 ...
Страница 17: ......
Страница 18: ...Chapter 1 Outline PAGE 1 1 Chapter 1 Outline 1 ...
Страница 25: ......
Страница 26: ...Chapter 2 Specifications PAGE 2 1 Chapter 2 Specifications 2 ...
Страница 34: ...Chapter 3 System Description PAGE 3 1 Chapter 3 System Description 3 ...
Страница 64: ...Chapter 4 Installation and Wiring PAGE 4 1 Chapter 4 Installation and Wiring 4 ...
Страница 131: ...Chapter 4 Installation and Wiring PAGE 4 68 Blank Page ...
Страница 132: ...Chapter 5 I O Expansion Unit Page 5 1 Chapter 5 I O Expansion Unit 5 ...
Страница 164: ...Chapter 6 Power up and Initial Checks PAGE 6 1 Chapter 6 Power Up and Initial Checks 6 ...
Страница 168: ...Chapter 7 Fastening Instructions PAGE 7 1 Chapter 7 Fastening Instructions 7 ...
Страница 207: ... Blank Page ...
Страница 208: ...Chapter 8 System Operation PAGE 8 1 Chapter 8 System Operation 8 ...
Страница 259: ...Chapter 8 System Operation PAGE 8 52 ...
Страница 260: ...Chapter 9 Maintenance Inspection PAGE 9 1 Chapter 9 Maintenance Inspection 9 ...
Страница 268: ...Chapter 10 Troubleshooting PAGE 10 1 Chapter 10 Troubleshooting 10 ...
Страница 294: ......