![Fayat Bomag CR 820 T Tier 4 Скачать руководство пользователя страница 92](http://html1.mh-extra.com/html/fayat/bomag-cr-820-t-tier-4/bomag-cr-820-t-tier-4_operating-instructions-maintenance-instructions_546860092.webp)
7 Standard Operating Procedures
Operations Manual
CR 820 T
Date May 2020
Page 7-20
SPN 3712 – FMI 0 = Aftertreatment SCR Induce-
ment – Most Severe
Like with Primary & Secondary Inducement, the
first step is to clear all other codes except for the
above two. After that is complete, an ‘Operator
Action’ is required:
• Transition the throttle from Low-Idle to
High-Idle
• Power Cycle the machine
This will clear SPN 3712 – FMI 0. The final step is
to run the machine for several minutes, so that the
SPN 3714 – FMI 31 Clears.
ESC - Exhaust System Clean-
ing
Exhaust System Cleaning is an automatic process
initiated by the ECM to reduce particulates and
maintain efficiency of the Aftertreatment system.
Exhaust temperature will increase and the engine
may automatically increase the engine speed dur-
ing this process.
Figure 7.31
- Aftertreatment Exhaust System Cleaning
Содержание Bomag CR 820 T Tier 4
Страница 1: ...00808924 05 20 Operating Instructions Maintenance Instructions CR 820 T Tier 4 Hot Mix Asphalt Paver ...
Страница 2: ...Intentionally Left Blank ...
Страница 3: ...Table of Contents Date May 2020 Page 1 Operations Manual CR 820 T TABLE OF CONTENTS ...
Страница 10: ...Table of Contents Operations Manual CR 820 T Date May 2020 Page 8 Intentionally Left Blank ...
Страница 11: ...1 INTRODUCTION Date May 2020 Page 1 1 Operations Manual CR 820 T 1 INTRODUCTION ...
Страница 16: ...1 INTRODUCTION Operations Manual CR 820 T Date May 2020 Page 1 6 Intentionally Left Blank ...
Страница 17: ...2 Safety Date May 2020 Page 2 1 Operations Manual CR 820 T 2 SAFETY ...
Страница 29: ...2 Safety Date May 2020 Page 2 13 Operations Manual CR 820 T Decal 23 Paver Moving Instructions 91312955 ...
Страница 33: ...2 Safety Date May 2020 Page 2 17 Operations Manual CR 820 T Figure 2 3 Right Side View Figure 2 4 Front View ...
Страница 38: ...2 Safety Operations Manual CR 820 T Date May 2020 Page 2 22 Intentionally Left Blank ...
Страница 39: ...3 Technical Data Date May 2020 Page 3 1 Operations Manual CR 820 T 3 TECHNICAL DATA ...
Страница 41: ...4 Operator Controls Date May 2020 Page 4 1 Operations Manual CR 820 T 4 OPERATOR CONTROLS ...
Страница 56: ...4 Operator Controls Operations Manual CR 820 T Date May 2020 Page 4 16 C B H D Figure 4 9 Main Run Screen ...
Страница 63: ...5 Shipping and Lifting Machine Date May 2020 Page 5 1 Operations Manual CR 820 T 5 SHIPPING AND LIFTING ...
Страница 68: ...5 Shipping and Lifting Machine Operations Manual CR 820 T Date May 2020 Page 5 6 Intentionally Left Blank ...
Страница 72: ...6 Initial Setup and Adjustments Operations Manual CR 820 T Date May 2020 Page 6 4 Intentionally Left Blank ...
Страница 93: ...8 Emergency Procedures Date May 2020 Page 8 1 Operations Manual CR 820 T 8 EMERGENCY PROCEDURES ...
Страница 98: ...8 Emergency Procedures Operations Manual CR 820 T Date May 2020 Page 8 6 Intentionally Left Blank ...
Страница 99: ...9 Maintenance Date May 2020 Page 9 1 Operations Manual CR 820 T 9 MAINTENANCE ...
Страница 126: ...9 Maintenance Operations Manual CR 820 T Date May 2020 Page 9 28 Intentionally Left Blank ...
Страница 127: ...10 Storage Date May 2020 Page 10 1 Operations Manual CR 820 T 10 STORAGE ...
Страница 129: ...Intentionally Left Blank ...
Страница 130: ...Printed in U S A BOMAG Americas Inc 125 Blue Granite Parkway Ridgeway South Carolina 29130 U S A 800 782 6624 ...