![Fayat Bomag CR 820 T Tier 4 Скачать руководство пользователя страница 71](http://html1.mh-extra.com/html/fayat/bomag-cr-820-t-tier-4/bomag-cr-820-t-tier-4_operating-instructions-maintenance-instructions_546860071.webp)
6 Initial Setup and Adjustments
Date May 2020
Page 6-3
Operations Manual
CR 820 T
Figure 6.2
- Screed Connections
a.
Hydraulic hoses from the left hand screed valve assembly to the male and female connections
(3) on the tractor.
b.
Hydraulic hose (4) from the center vibrator tees to the left side auger motor.
c.
MOBA control electrical cable from the left hand screed control box to connector (5).
d.
Main power electrical cable from the left hand screed control box to connector (6).
e.
MOBA control electrical cable from the right hand screed control box to connector (7).
f.
Hydraulic hoses from the center vibrator tees to the male and female connections (8) on the
tractor.
g.
If the screed has electric heaters, connect single receptor connector (connector B) to left hand
connector (9) and connect three receptor connector (connector A) to right hand connector (10).
Содержание Bomag CR 820 T Tier 4
Страница 1: ...00808924 05 20 Operating Instructions Maintenance Instructions CR 820 T Tier 4 Hot Mix Asphalt Paver ...
Страница 2: ...Intentionally Left Blank ...
Страница 3: ...Table of Contents Date May 2020 Page 1 Operations Manual CR 820 T TABLE OF CONTENTS ...
Страница 10: ...Table of Contents Operations Manual CR 820 T Date May 2020 Page 8 Intentionally Left Blank ...
Страница 11: ...1 INTRODUCTION Date May 2020 Page 1 1 Operations Manual CR 820 T 1 INTRODUCTION ...
Страница 16: ...1 INTRODUCTION Operations Manual CR 820 T Date May 2020 Page 1 6 Intentionally Left Blank ...
Страница 17: ...2 Safety Date May 2020 Page 2 1 Operations Manual CR 820 T 2 SAFETY ...
Страница 29: ...2 Safety Date May 2020 Page 2 13 Operations Manual CR 820 T Decal 23 Paver Moving Instructions 91312955 ...
Страница 33: ...2 Safety Date May 2020 Page 2 17 Operations Manual CR 820 T Figure 2 3 Right Side View Figure 2 4 Front View ...
Страница 38: ...2 Safety Operations Manual CR 820 T Date May 2020 Page 2 22 Intentionally Left Blank ...
Страница 39: ...3 Technical Data Date May 2020 Page 3 1 Operations Manual CR 820 T 3 TECHNICAL DATA ...
Страница 41: ...4 Operator Controls Date May 2020 Page 4 1 Operations Manual CR 820 T 4 OPERATOR CONTROLS ...
Страница 56: ...4 Operator Controls Operations Manual CR 820 T Date May 2020 Page 4 16 C B H D Figure 4 9 Main Run Screen ...
Страница 63: ...5 Shipping and Lifting Machine Date May 2020 Page 5 1 Operations Manual CR 820 T 5 SHIPPING AND LIFTING ...
Страница 68: ...5 Shipping and Lifting Machine Operations Manual CR 820 T Date May 2020 Page 5 6 Intentionally Left Blank ...
Страница 72: ...6 Initial Setup and Adjustments Operations Manual CR 820 T Date May 2020 Page 6 4 Intentionally Left Blank ...
Страница 93: ...8 Emergency Procedures Date May 2020 Page 8 1 Operations Manual CR 820 T 8 EMERGENCY PROCEDURES ...
Страница 98: ...8 Emergency Procedures Operations Manual CR 820 T Date May 2020 Page 8 6 Intentionally Left Blank ...
Страница 99: ...9 Maintenance Date May 2020 Page 9 1 Operations Manual CR 820 T 9 MAINTENANCE ...
Страница 126: ...9 Maintenance Operations Manual CR 820 T Date May 2020 Page 9 28 Intentionally Left Blank ...
Страница 127: ...10 Storage Date May 2020 Page 10 1 Operations Manual CR 820 T 10 STORAGE ...
Страница 129: ...Intentionally Left Blank ...
Страница 130: ...Printed in U S A BOMAG Americas Inc 125 Blue Granite Parkway Ridgeway South Carolina 29130 U S A 800 782 6624 ...