![Fayat Bomag CR 820 T Tier 4 Скачать руководство пользователя страница 101](http://html1.mh-extra.com/html/fayat/bomag-cr-820-t-tier-4/bomag-cr-820-t-tier-4_operating-instructions-maintenance-instructions_546860101.webp)
9 Maintenance
Date May 2020
Page 9-3
Operations Manual
CR 820 T
After First 40 Service Hours Only
Item
Service
Lube
Final Drive Oil
Check.
80W-140
Synthetic
Spreading Auger
Check.
EP1 or EP2
Speed Reducer
Check.
80W-140
Synthetic
Generator
With engine off, check generator main phase
circuits. Tighten as required.
-
Every 40 Service Hours
Item
Service
Lube
Engine Belt
Inspect.
-
Battery
Check for leaks (Sealed Battery)
-
Rubber Track Tension
The tracks on a rubber-track paver are self-ad-
justed and do not require periodic adjustment.
If the tracks appear loose, troubleshoot the
track hydraulic system.
-
Pump Drive Belts
Check tension.
-
Match Height Assembly
Lubricate.
EP1 or EP2
Extension Slope Assembly
Lubricate.
EP1 or EP2
Spreading Auger
Lubricate drive chains.
EP1 or EP2
Lubrication
Lubricate grease points on depth cranks, crown
control and swivel seats.
EP1 or EP2
After First 150 Service Hours
Item
Service
Lube
Final Drive
Change oil after the first 150 hours of opera
-
tion. Thereafter, the regular interval for replac
-
ing the oil is every 1,000 service hours.
80W-140
Synthetic
Every 250 Service Hours
Item
Service
Lube
Hood Raise Reservoir
Check oil level.
50/50 Mix
Lubrication
Lubricate grease points on steering linkage, bo
-
gie beam bearings and slope beam rod ends.
EP1 or EP2
* See engine manual.
Содержание Bomag CR 820 T Tier 4
Страница 1: ...00808924 05 20 Operating Instructions Maintenance Instructions CR 820 T Tier 4 Hot Mix Asphalt Paver ...
Страница 2: ...Intentionally Left Blank ...
Страница 3: ...Table of Contents Date May 2020 Page 1 Operations Manual CR 820 T TABLE OF CONTENTS ...
Страница 10: ...Table of Contents Operations Manual CR 820 T Date May 2020 Page 8 Intentionally Left Blank ...
Страница 11: ...1 INTRODUCTION Date May 2020 Page 1 1 Operations Manual CR 820 T 1 INTRODUCTION ...
Страница 16: ...1 INTRODUCTION Operations Manual CR 820 T Date May 2020 Page 1 6 Intentionally Left Blank ...
Страница 17: ...2 Safety Date May 2020 Page 2 1 Operations Manual CR 820 T 2 SAFETY ...
Страница 29: ...2 Safety Date May 2020 Page 2 13 Operations Manual CR 820 T Decal 23 Paver Moving Instructions 91312955 ...
Страница 33: ...2 Safety Date May 2020 Page 2 17 Operations Manual CR 820 T Figure 2 3 Right Side View Figure 2 4 Front View ...
Страница 38: ...2 Safety Operations Manual CR 820 T Date May 2020 Page 2 22 Intentionally Left Blank ...
Страница 39: ...3 Technical Data Date May 2020 Page 3 1 Operations Manual CR 820 T 3 TECHNICAL DATA ...
Страница 41: ...4 Operator Controls Date May 2020 Page 4 1 Operations Manual CR 820 T 4 OPERATOR CONTROLS ...
Страница 56: ...4 Operator Controls Operations Manual CR 820 T Date May 2020 Page 4 16 C B H D Figure 4 9 Main Run Screen ...
Страница 63: ...5 Shipping and Lifting Machine Date May 2020 Page 5 1 Operations Manual CR 820 T 5 SHIPPING AND LIFTING ...
Страница 68: ...5 Shipping and Lifting Machine Operations Manual CR 820 T Date May 2020 Page 5 6 Intentionally Left Blank ...
Страница 72: ...6 Initial Setup and Adjustments Operations Manual CR 820 T Date May 2020 Page 6 4 Intentionally Left Blank ...
Страница 93: ...8 Emergency Procedures Date May 2020 Page 8 1 Operations Manual CR 820 T 8 EMERGENCY PROCEDURES ...
Страница 98: ...8 Emergency Procedures Operations Manual CR 820 T Date May 2020 Page 8 6 Intentionally Left Blank ...
Страница 99: ...9 Maintenance Date May 2020 Page 9 1 Operations Manual CR 820 T 9 MAINTENANCE ...
Страница 126: ...9 Maintenance Operations Manual CR 820 T Date May 2020 Page 9 28 Intentionally Left Blank ...
Страница 127: ...10 Storage Date May 2020 Page 10 1 Operations Manual CR 820 T 10 STORAGE ...
Страница 129: ...Intentionally Left Blank ...
Страница 130: ...Printed in U S A BOMAG Americas Inc 125 Blue Granite Parkway Ridgeway South Carolina 29130 U S A 800 782 6624 ...